Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

7 unique locations (47 components)

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
Place Farm Glasshouse, A134, Ingham, Suffolk IP31 1NQ (2 components)

2No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment (2)

Active • 2024-25 (T-4), 2023-24 (T-4)
Ottringham Road Keyingham Hull North Humberside HU12 9RX (6 components)

Eight gas CHP engines for commercial horticultural use with no auxilliary load (3)

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU 888806 FLEX06 +1 more HU12
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Melrow Nursery, Rydings Lane, Southport PR9 8EB (11 components)

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity … (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Marsh Road, Banks, Southport PR9 8DX (14 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX33 FLEX33 +1 more PR9
Active • 2024-25 (T-4), 2023-24 (T-4) ...
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (8 components)

One CHP, generating for site load which exceeds generating capacity. No aux load. (3)

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX108 FLEX32 +1 more EH9
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (4 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load. (3)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX108 EH25
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Crown Point Glasshouse, Kirby Road, Norwich, NR14 7DU (2 components)

3No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment (2)

Active • 2024-25 (T-4), 2023-24 (T-4)
Loading map...
Showing 7 locations