Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

12 unique locations (78 components)

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
Young's House, Wickham Road, Grimsby DN32 8HW (4 components) Geocoding Needed
β€’ On-site Generating CMU
β€’ on site generating CMU
Active β€’ 2028-29 (T-4), 2025-26 (T-1) ...
8.22 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components) Geocoding Needed

Existing Generation on existing site - CHP

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
39.32 MW
Speke Blvd, Speke, Liverpool L24 9LE (3 components) Geocoding Needed
β€’ On-site Generating CMU
β€’ on site generating CMU
Active β€’ 2025-26 (T-1), 2024-25 (T-1) ...
9.61 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (10 components) Geocoding Needed

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
22.71 MW
Solvay, Trinity St, Oldbury, B69 4LW (6 components) Geocoding Needed

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected B69
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
6.66 MW
Pembroke Rd, Merlin's Bridge, Haverfordwest SA61 1JN (6 components) Geocoding Needed

Existing Generation on existing site - CHP

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
5.67 MW
Hugden Way, Malton YO17 9HG (4 components) Geocoding Needed
β€’ On-site Generating Unit.
β€’ on site generating cmu
Active β€’ 2028-29 (T-4), 2025-26 (T-1) ...
8.94 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA. (12 components) Geocoding Needed
β€’ existing on site CHP
β€’ existing onsite CHP
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected DN16
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
105.77 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (12 components) Geocoding Needed
β€’ existing CHP on site.
β€’ existing on site CHP
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected DN16
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
69.98 MW
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (4 components) Geocoding Needed

on site generating CMU

Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
5.85 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (6 components) Geocoding Needed

Existing Generation on existing site - CHP

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
5.67 MW
2 Samworth Way, Melton Mowbray LE13 1GA (5 components) Geocoding Needed

Existing Generation on existing site - CHP

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
6.67 MW
Loading map...
Showing 12 locations