Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

49 unique locations (528 components) - Page 1 of 2

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
530 London Road, Croydon CR7 7YE (5 components) Geocoding Needed

CHP

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Rejected CR7
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
2.45 MW
Address: Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (10 components) Geocoding Needed

Gas fired CHP

Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
112.83 MW
Aventine Way, Glebe Farm Industrial Estate, Rugby, CV21 1HA (14 components) Geocoding Needed

A gas CHP supplying a manufacturing facility

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU BVC_CHP BVC_CHP +2 more CV21
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
11.94 MW
Burnside Mills, Kendal, Cumbria, LA9 6PZ (6 components) Geocoding Needed

Gas fired CHP unit

Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
24.49 MW
Cardiff Road, Barry, Vale of Glamorgan, CF63 2YL (8 components) Geocoding Needed

Gas Turbine CHP GT001A

Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
28.23 MW
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (22 components) Geocoding Needed
β€’ Gas Turbine CHP GT001A
β€’ Gas Turbine CHP GT001B
β€’ Steam Turbine CHP
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
102.71 MW
Church Manorway, Erith DA8 1DL (36 components) Geocoding Needed

gas-fired CHP unit

CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU EGEN22 EGEN22 +5 more DA8
Active β€’ 2025-26 (T-4), 2024-25 (T-1) ...
59.86 MW
Cobden Street, Montrose, Angus, DD10 8EA (9 components) Geocoding Needed

On-site existing CHP generating unit

CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1B-MT Glaxo Barnard Montrose Ware & Worthing +2 more DD10
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
17.16 MW
Denison Road, Selby, North Yorkshire, YO8 8AN (13 components) Geocoding Needed
β€’ Gas Turbine Cogeneration Unit
β€’ One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
59.24 MW
Denmark Hill, Brixton, London, SE5 9RS (8 components) Geocoding Needed
β€’ Behind the Meter CHP Unit
β€’ CHP unit
β€’ Gas fired CHP unit
Active β€’ 2025-26 (T-1), 2023-24 (T-4) ...
19.03 MW
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (4 components) Geocoding Needed

Two CHP, generating for site load which exceeds generating capacity. No aux load.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX108 EH25
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
3.51 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (32 components) Geocoding Needed
β€’ Steam Driven Turbo Alternator 8G1 6,8 MWe
β€’ Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
β€’ TLOR-1 1 ea 38MWe Cogeneration Unit 9G1
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST07 EA 17/18 REST08 +14 more DN40
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
305.66 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (36 components) Geocoding Needed
β€’ One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
β€’ One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
45.86 MW
Energy Centre, St James's University Hospital, Beckett Street, Leeds, LS9 7TF. (5 components) Geocoding Needed

4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine.

Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
7.94 MW
Foresterhill Health Campus, Aberdeen AB25 2AY (6 components) Geocoding Needed

A gas turbine installed at Aberdeen Royal Infirmary

Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
6.80 MW
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (18 components)

On-site existing CHP generating unit (3)

CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES2A-ST Glaxo R&D Stevenage, Ware +2 more SG1
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (18 components) Geocoding Needed

On-site existing CHP generating unit

Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
25.23 MW
Hammersmith Hospital, Du Cane Road, Shepherds Bush, London, W12 0HS (5 components) Geocoding Needed

A gas turbine CHP, providing steam and electricity to Hammersmith Hospital

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU IMP_CHP IMP_SPX CHP W12
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
4.15 MW
Harmire Road, Barnard Castle, County Durham, DL12 8D (7 components) Geocoding Needed

On-site existing CHP generating unit

Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1A-BC Glaxo Barnard Montrose Ware & Worthing
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
8.43 MW
Harmire Road, Barnard Castle, County Durham, DL12 8DT (13 components) Geocoding Needed

On-site existing CHP generating unit

Reciprocating Engines CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1A-BC Glaxo Barnard Montrose Ware & Worthing +2 more DL12
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
18.20 MW
Haxby Rd, York, YO91 1XY (9 components) Geocoding Needed
β€’ CHP Unit
β€’ Gas fired CHP unit
CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG77 Nestle +2 more YO91
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
23.90 MW
JDE, Ruscote Avenue, Banbury, Oxfordshire, OX16 2QU (16 components) Geocoding Needed
β€’ Centrax gas turbine CHP
β€’ Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU20 GCMU20 +3 more OX16
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
34.36 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (8 components) Geocoding Needed

One CHP, generating for site load which exceeds generating capacity. No aux load.

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX108 FLEX32 +1 more EH9
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
5.96 MW
Leicester Royal Infirmary, Infirmary Square, Leicester, LE1 5WW (5 components) Geocoding Needed

CHP Unit

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU LeicsNHS LeicsNHS LE1
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
8.12 MW
Lhoist UK Ltd, Hindlow, Buxton, SK17 0EL (9 components) Geocoding Needed
β€’ GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
β€’ GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
β€’ GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
7.21 MW
Loading map...
Showing 25 locations