Combined Cycle Gas Turbine (CCGT)

66 unique locations (356 components) - Page 1 of 3

Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (12 components)
• 8MW Energy Storage facility located in Harrogate.
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• New build Combined Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (10 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
720.00 MW
Whessoe Road, Whessoe, Harrowgate Village, Darlington, DL3 0XD (1 component)

The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire.

Inactive • 2021-22 (T-4)
Wheldale 1 Wheldale Generation Site Wheldale Road Castleford West Yorkshire WF10 2RR (6 components)
• Milling Motor Pelletizers, Fans etc
• New build Combined Cycle Gas Turbine unit 1 at Eggborough power station.
• load curtailment at site
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Tyseley, Hay Hall Road, Tyseley, B11 2AU (2 components)
• Connah's Quay PS Unit 2 CCGT
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2020-21 (T-4)
Tring Road, Tring, HP23 4RA (6 components)
• 20 x 1mw gas generator units to be installed on designated land at Tring Road - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• A gas fuelled generating station.
• Connah's Quay PS Unit 4 CCGT
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Trent Basin Nottingham NG2 4DS (3 components)
• A 0.5MW Lithium Ion Battery based in Nottingham
• Connah's Quay PS Unit 1 CCGT
Inactive • 2022-23 (T-4), 2018-19 (T-1)
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (5 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• Aggregate CMU from Multiple Sources
• Didcot B5 - CCGT
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (3 components)
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• gas-fired CHP unit
Inactive • 2021-22 (T-4), 2020-21 (T-4)
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (5 components)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being …

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
175.20 MW
Solway Trading Estate Maryport Cumbria CA15 8NF (4 components)
• Connah's Quay PS Unit 2 CCGT
• New build power station comprised of multiple reciprocating engines.
Inactive • 2022-23 (T-3), 2020-21 (T-1) ...
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (2 components)
• N/A
• Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones 275kV 'B' Substation.
Inactive • 2023-24 (T-4)
488.34 MW
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (1 component)

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones …

Inactive • 2023-24 (T-4)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (7 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
55.09 MW
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (5 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Salford Lodge Pitchill Evesham WR11 8SN (3 components)
• 0.1MW Tesla battery located at Eversham
• Connah's Quay PS Unit 1 CCGT
Inactive • 2022-23 (T-4), 2018-19 (T-1)
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Inactive • 2021-22 (T-4)
1.63 MW
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Rothesay Dock, Glasgow, G81 1LX (5 components)
• Connah's Quay PS Unit 3 CCGT
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Park Road Worthing, West Sussex, BN11 2AW (1 component)

Connah's Quay PS Unit 1 CCGT

Inactive • 2023-24 (T-4)
McCains Scarborough - Site 2, Havers Hill, Eastfield, Scarborough YO11 3BS, UK (8 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Peterhead CCGT
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Marks & Spencer, 229 Lakeside Shopping Centre, West Thurrock, Grays, RM20 2ZQ (5 components)
• EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
• Import/Export metering with diesel generation at a retail store
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
0.77 MW
M1, Luton, LU5 6HR (2 components)
• Connah's Quay PS Unit 4 CCGT
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Inactive • 2023-24 (T-4), 2022-23 (T-4)
47.02 MW
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, ST5 9JA (8 components)
• Medway CCGT
• The CMU Component is made of brand new gas-fired engines.
• The CMU Component is made up of gas-fired engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (2 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF.

Inactive • 2022-23 (T-4), 2021-22 (T-4)