Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

189 unique locations (2900 components) - Page 1 of 8

111 Brancroft Way Enfield Middlesex EN3 7PL (7 components)

Enfield CCGT Power Station - (one unit station)

Active โ€ข 2027-28 (T-4), 2024-25 (T-4) ...
404.83 MW
111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)
โ€ข Enfield CCGT Power Station - (one unit station)
โ€ข Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
โ€ข N/A
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
403.07 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (13 components)
โ€ข 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
โ€ข One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
โ€ข Poole Existing Site CHP
Active โ€ข 2027-28 (T-4), 2024-25 (T-4) ...
1763.05 MW
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (4 components)
โ€ข Combined Cycle Gas Turbine
โ€ข Combined Cycle Gas Turbine plant
โ€ข Gas fired reciprocating engine(s)
Active โ€ข 2028-29 (T-4), 2026-27 (T-4) ...
978.65 MW
1 Ratty's Lane, Hoddesdon, Hertsfordshire, EN11 0RF (2 components)
โ€ข Combined Cycle Gas Turbine
โ€ข Water treatment centre
Inactive โ€ข 2022-23 (T-3), 2020-21 (T-4)
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 0RF (2 components)

Combined Cycle Gas Turbine

Inactive โ€ข 2022-23 (T-4)
643.50 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (35 components)
โ€ข EV charging at residential premises
โ€ข Operational Reciprocating Engine
โ€ข Operational gas reciprocating engine.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
15.10 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)
โ€ข 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
โ€ข Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
โ€ข Gas CHP engines in commercial horticultural usage with no auxilliary load
Active โ€ข 2027-28 (T-4), 2025-26 (T-4) ...
20.43 MW
4 Finway Road Hemel Hempstead HP2 7PT (11 components)
โ€ข 14.710 MW CHP generation
โ€ข Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
โ€ข Onsite load reduction and back up generation behind the meter on multiple sites
Active โ€ข 2024-25 (T-4), 2022-23 (T-3) ...
4.76 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
โ€ข E1000 CHP
โ€ข Existing CCGT
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active โ€ข 2026-27 (T-4), 2024-25 (T-4) ...
2435.45 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane ,ย Wolverhampton, WV10 9QD (30 components)
โ€ข Gas fired reciprocating engines.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (17 components)
โ€ข Keadby 1 CCGT
โ€ข The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
721.35 MW
Amy Johnson Way Blackpool FY4 2RP (2 components)
โ€ข 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 1.5MW together with transformers, switchgear and associated control gear
โ€ข Existing CCGT Unit
Inactive โ€ข 2022-23 (T-3), 2021-22 (T-4)
Ardagh Group - Barnsely Site 1, Burton Road, Monk Bretton South Yorkshire S71 5RP (15 components)
โ€ข Gas-fired CHP unit
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข Load reduction on site supported by non-exporting standby generation.
Active โ€ข 2028-29 (T-4), 2025-26 (T-4) ...
16.24 MW
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR (9 components)
โ€ข DSR Component providing load turn down at a retail store
โ€ข Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.
โ€ข NEW BUILD GAS FUELLED GENERATING STATION
Active โ€ข 2028-29 (T-4), 2024-25 (T-1) ...
10.16 MW
Asda Boldon, North Road, Boldon Colliery, NE35 9AR (11 components)
โ€ข Load curtailment
โ€ข The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active โ€ข 2028-29 (T-4), 2025-26 (T-4) ...
278.88 MW
Asda Boston, Monument Road, Bicker, Lincolnshire PE20 3DJ (6 components)
โ€ข A new build 11MW battery storage system
โ€ข A new build gas fuelled generating station.
โ€ข Great Yarmouth 1 - CCGT MSID: 7111
Inactive โ€ข 2022-23 (T-3), 2021-22 (T-4) ...
Asda Boston, Pudding Lane Spalding, Lincs, PE11 3TJ (7 components)
โ€ข 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
โ€ข Load curtailment at site via standby generation
โ€ข West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
Inactive โ€ข 2022-23 (T-4), 2022-23 (T-3) ...
Asda Brierley Hill, Pearson Street, Dudley, DY5 3BJ (11 components)
โ€ข Enfield CCGT Power Station - (one unit station)
โ€ข Load curtailment
Active โ€ข 2028-29 (T-4), 2025-26 (T-4) ...
415.30 MW
Asda Coventry, Brade Drive, Walsgrave, CV2 2PN (11 components)
โ€ข Cottam Development Centre (CDC) CCGT single unit station
โ€ข Load curtailment
Active โ€ข 2028-29 (T-4), 2025-26 (T-4) ...
418.03 MW
Asda Dyce, Cairnton Road, Boyndie, Banffshire, AB45 2LR (8 components)
โ€ข Didcot B6 - CCGT MSID: 4055
โ€ข New Build gas fuelled generation station.
โ€ข This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
Active โ€ข 2026-27 (T-4), 2023-24 (T-4) ...
Asda Glasshoughton, Leeds Road WF10 5EL (8 components)
โ€ข Didcot B6 - CCGT
โ€ข Load curtailment from refridgeration
โ€ข Load drop
Active โ€ข 2028-29 (T-4), 2025-26 (T-4) ...
22.46 MW
Asda Greengates, 147 New Line , Bradford, BD10 0BT (12 components)
โ€ข District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
โ€ข Load curtailment from refridgeration
โ€ข Pembroke 41 - CCGT MSID: 7237
Active โ€ข 2028-29 (T-4), 2025-26 (T-4) ...
13.36 MW
Asda Ponders End, Iceland Foods 5 Solar Way Innova Park Brimsdown Enfield EN3 7XY (5 components)
โ€ข A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
โ€ข Mix of load reduction and standby generation
Inactive โ€ข 2022-23 (T-3), 2021-22 (T-4) ...
Asda Tain, Knockbreck Road , Tain, IV19 1LX (11 components)
โ€ข Didcot B5 - CCGT MSID: 4055
โ€ข Load curtailment
Active โ€ข 2028-29 (T-4), 2025-26 (T-4) ...
705.70 MW
Loading map...
Showing 25 locations