Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

67 unique locations (980 components) - Page 3 of 3

Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL (7 components)
• Deeside CCGT Power Station.
• Deeside CCGT Power Station. Please note: The TEC deferral box has been ticked on the CMU Main Page. The text on the EMR Portal screen mentions Rule 3.6.3(b) and the commitment to secure TEC by 18 months before the Delivery Year. DEEP_1 is applying for the Supplementary Auction only and therefore this option has been used in relation to Rule 3.10A.2, where TEC is required by 6 months prior to the Delivery Year.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
370.02 MW
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ (13 components)

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3037.88 MW
Cottam Development Centre Power Station Cottam Retford DN22 0TF (13 components)

Cottam Development Centre (CDC) CCGT single unit station

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1362.24 MW
Corringham, Stanford-le-Hope, Essex SS17 9LP UK (3 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land …

Inactive • 2021-22 (T-4), 2020-21 (T-4)
1095.30 MW
Clough Lane North Killingholme North Lincolnshire DN40 3JP (6 components)

A combined cycle gas turbine generating plant

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1282.77 MW
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (15 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
363.08 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (44 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3471.17 MW
Basin Road South. Portslade. East Sussex. BN41 1WF (6 components)

Combined Cycle Gas Turbine plant

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
186.15 MW
Basin Road South, Portslade, East Sussex, BN41 1WF (4 components)

Combined Cycle Gas Turbine plant

Active • 2028-29 (T-4), 2023-24 (T-4) ...
573.24 MW
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (28 components)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT Baglan Unit 1
• Existing OCGT module
Active • 2024-25 (T-4), 2023-24 (T-4) ...
428.74 MW
Ashland Farm Beck Lane Skegby Sutton in Ashfield NG19 6PG (2 components)

New Build gas fuelled generation station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 0RF (3 components)

Combined Cycle Gas Turbine

Inactive • 2022-23 (T-4), 2021-22 (T-4)
643.50 MW
1 Ratty's Lane, Hoddesdon, Hertsfordshire, EN11 0RF (2 components)

Combined Cycle Gas Turbine

Inactive • 2023-24 (T-4), 2022-23 (T-3)
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (2 components)
• Combined Cycle Gas Turbine
• Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2026-27 (T-4)
978.65 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (12 components)
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1761.93 MW
111 Brancroft Way Enfield Middlesex EN3 7PL (21 components)

Enfield CCGT Power Station - (one unit station)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1595.21 MW
Loading map...
Showing 17 locations