Combined Cycle Gas Turbine (CCGT)
138 unique locations (2530 components) - Page 5 of 6
Rockingham South, Smoke Land, Avonmouth, BS11 0YT (5 components)
Rosper Road Immingham North Lincolnshire DN40 3DZ (23 components)
Rosper Road Immingham North Lincolnshire DN40 3DZ (23 components)
Seabank Power Limited Severn Road, Hallen Bristol BS10 7SP (24 components)
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (24 components)
Seabank Power Limited, Severn Road, Hallen, Bristol BS10 7SP (22 components)
Severn Power Station West Nash Road Nash Newport Gwent NP18 2BZ (2 components)
Severn Power Station, West Nash Road, Nash, Newport, Gwent, NP18 2BZ (2 components)
Severn Power Station West Nash Road Nash Newport NP18 2BZ (22 components)
Severn Power Station, West Nash Road, Nash, Newport, NP18 2BZ (22 components)
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (8 components)
Gas fuelled CHP generation plant (3)
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (2 components)
Site of the former Teesside Power Station, Greystone Road, Grangetown, Middlesbrough, TS6 8JF (2 components)
Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones … (2)
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (44 components)
Staythorpe Power Station, Staythorpe, Newark, Nottinghamshire, NG23 5PS (44 components)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (18 components)
Sutton Bridge Power Station, Centenary Way, Sutton Bridge, Lincolnshire, PE12 9TF (16 components)
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (12 components)
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (11 components)
A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being … (3)
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
The Manorway, Stanford-le-Hope, Essex, SS17 9LP (11 components)
A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)
3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure (3)
Ty Coch Farm Greenfield Holywell CH87HT (8 components)
Ty Coch Farm Greenfield Holywell CH8 7HT (8 components)
Gas fuelled generation plant (3)