Combined Cycle Gas Turbine (CCGT)

138 unique locations (2530 components) - Page 4 of 6

Active MW: 229775.30 MW
Inactive MW: 33894.12 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (15 components)
• Small Combined Cycle Gas Turbine plant
• Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF.
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Blackburn Mill Blackburn Mill +3 more BB2
Active • 2029-30 (T-4), 2028-29 (T-4) ...
277.65 MW
Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (15 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF. (2)

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Blackburn Mill Blackburn Mill BB2
Active • 2029-30 (T-4), 2028-29 (T-4) ...
277.65 MW
Lynchford Lane, Farnborough, GU14 6LW (4 components)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Open Cycle Gas Turbine (OCGT) Gas Generation Buckland Road Limited New Build Generating CMU Gas Generation Farnborough Gas Generation Farnborough +2 more Conditional GU14
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (12 components)
• Gensets 1. 2 & 3
• Marchwood CCGT
Combined Cycle Gas Turbine (CCGT) SSE ENERGY SUPPLY LIMITED Existing Generating CMU Marchwood Marchwood +8 more SO40
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3354.96 MW
213.63 MW
Marsh Green Industrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY (9 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
213.63 MW
Meaford Energy Centre, Meaford Business Park, Meaford Road, Meaford, Staffordshire, ST15 8UZ (4 components)

Gas Fired Generating Station

Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) Meaford Energy Limited New Build Generating CMU Meaford Generating Station Meaford Generating Station +2 more ST15
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Medway Power Station, Rochester, Medway, ME3 0AG (17 components)
• Medway
• Medway CCGT
Combined Cycle Gas Turbine (CCGT) MEDWAY POWER LIMITED Existing Generating CMU Medway Medway +12 more ME3
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4026.04 MW
Millbrook Power Station, Rookery South Pit, Green Lane, Stewartby, Bedfordshire MK43 9LX (3 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Open Cycle Gas Turbine (OCGT) MILLBROOK POWER LIMITED New Build Generating CMU Millbrook Power OCGT Millbrook Power OCGT MK43
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (25 components)
• The CMU is a Combined Cycle Gas Turbine (CCGT)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT) CORBY POWER LIMITED Existing Generating CMU New Build Generating CMU Corby_1 Corby_1 +12 more NN17
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3207.41 MW
New Hall Farm School Lane Birchwood Warrington WA3 6LH (3 components)

New Gas fulled generation station

Open Cycle Gas Turbine (OCGT) NEW HALL FARM ENERGY LIMITED New Build Generating CMU NHF111 Rejected WA3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Pembroke Power Station Pembroke Dyfed SA71 5SS (65 components)
Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_PEMB-11 CMU_PEMB-21 +3 more SA71
Active • 2029-30 (T-4), 2028-29 (T-4) ...
6183.38 MW
Pembroke Power Station, Pembroke, Dyfed, SA71 5SS (65 components)
• Gas Fired CCGT
• Gas fired CCGT
• Gas fired CCGT MSID 7237
Active • 2029-30 (T-4), 2028-29 (T-4) ...
6183.38 MW
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (5 components)

Existing OCGT plant.

Open Cycle Gas Turbine (OCGT) RIVER NENE POWER LIMITED Existing Generating CMU Peterborough Power Peterborough Power +2 more PE1
Active • 2029-30 (T-4), 2028-29 (T-4) ...
917.11 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (17 components)
• Peterhead 1
• Peterhead 1 for Delivery Year 2017/18 only
• Peterhead CCGT
Combined Cycle Gas Turbine (CCGT) SSE THERMAL GENERATION (SCOTLAND) LIMITED Existing Generating CMU Peterhead Peterhead +12 more AB42
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3242.27 MW
5326.18 MW
Power Station Road, Isle of Grain, Rochester, ME3 0AR (60 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
Active • 2029-30 (T-4), 2028-29 (T-4) ...
5326.18 MW
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (5 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) PROGRESS POWER LIMITED New Build Generating CMU Progress Power OCGT Progress Power OCGT +2 more IP23
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ratcliffe-on-Soar Nottingham NG11 0EE (60 components)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
505.30 MW
Ratcliffe-on-Soar, Nottingham, NG11 0EE (60 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U2 OCGT fuelled on Gas Oil as defined by BS2869 Class A2
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
505.30 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Gas turbine generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
114.55 MW