Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

67 unique locations (980 components) - Page 2 of 3

Knottingley Power Limited Knottingley CCGT Power Station Common Lane Knottingley West Yorkshire WF11 8DA (6 components)
• Knottingley Unit 1 is a combined cycle gas turbine generating unit
• Knottingly Unit 2 is a combined cycle gas turbine generating unit
Inactive • 2021-22 (T-4), 2020-21 (T-4)
1117.80 MW
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (4 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Inactive • 2021-22 (T-4)
1557.00 MW
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (12 components)
• Combined Cycle Gas Turbine plant
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1887.09 MW
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (2 components)

Combined Cycle Gas Turbine plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (7 components)
• A new Combined Cycle Gas Turbine unit (unit 4) at Damhead Creek 2 power plant
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
• Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5480.84 MW
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (6 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
547.88 MW
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (13 components)
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
• New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
765.00 MW
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (73 components)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2714.06 MW
230.64 MW
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (58 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6623.53 MW
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (3 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Inactive • 2021-22 (T-4), 2020-21 (T-4)
369.00 MW
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (7 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
Active • 2028-29 (T-4), 2027-28 (T-4) ...
136.00 MW
Huntsman Drive, Seal Sands, TS2 1TT (5 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …

Active • 2024-25 (T-1), 2023-24 (T-1)
128.51 MW
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (13 components)
• Great Yarmouth 1 - CCGT
• Great Yarmouth 1 - CCGT MSID: 7111
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1606.13 MW
EP South Humber Bank Power Station, South Marsh Road, Stallingborough, DN41 8BZ (8 components)
• EP South Humber Bank Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
• EP South Humber Bank Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
Active • 2028-29 (T-4), 2025-26 (T-4)
263.67 MW
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW. (9 components)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1757.33 MW
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW (4 components)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2028-29 (T-4)
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (7 components)

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
252.00 MW
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (7 components)

EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
252.00 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (46 components)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 6)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4371.10 MW
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (13 components)
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-19= 100% T_WBURB-3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1246.05 MW
Drax Power Station, Selby, YO8 8PH (1 component)

New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site

Inactive • 2023-24 (T-4)
Drakelow Power Station, Burton on Trent, DE15 9TZ (5 components)

The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
175.50 MW
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (39 components)
• Didcot B5 - CCGT MSID: 4055
• Didcot B6 - CCGT
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4732.58 MW
Loading map...
Showing 25 locations