Combined Cycle Gas Turbine (CCGT)

137 unique locations (2420 components) - Page 1 of 6

Active MW: 229775.30 MW
Inactive MW: 33894.12 MW
111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)
Combined Cycle Gas Turbine (CCGT) UNIPER UK LIMITED Existing Generating CMU Enfield EN3
Active • 2029-30 (T-4), 2028-29 (T-4) ...
1619.15 MW
111 Brancroft Way, Enfield, Middlesex, EN3 7PL (12 components)

Enfield CCGT Power Station - (one unit station)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
1619.15 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (18 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 425MW of Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT) CARRINGTON STORAGE LIMITED CARLTON ENERGY NO: 5 LIMITED New Build Generating CMU Trafford Power Battery Storage Unit 1 Trafford Power Battery Storage Unit 1 +15 more M31
Active • 2029-30 (T-4), 2027-28 (T-4) ...
488.49 MW
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (6 components)
• Combined Cycle Gas Turbine
• Combined Cycle Gas Turbine plant
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Rye House Rye House +2 more EN11
Active • 2029-30 (T-4), 2028-29 (T-4) ...
1961.87 MW
1 Ratty's Lane, Hoddesdon, Hertsfordshire, EN11 0RF (5 components)

Combined Cycle Gas Turbine

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Rye House Rye House EN11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 0RF (5 components)

Combined Cycle Gas Turbine (2)

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Rye House Rye House EN11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Abergelli Power Station, Felindre, Swansea, SA5 7NN (5 components)
• A new Open Cycle Gas Turbine (OCGT) peaking power plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Open Cycle Gas Turbine (OCGT) ABERGELLI POWER LIMITED New Build Generating CMU Abergelli OCGT Abergelli OCGT +2 more SA5
Active • 2026-27 (T-4), 2025-26 (T-4) ...
284.59 MW
Aberthaw Power Station, The Leys, Aberthaw, Barry, Mid Glamorgan, CF62 4ZW (48 components)
• Aberthaw 7 Coal fired unit
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (11 components)
• Small gas fired CCGT.
• Small gas fired OCGT.
Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Existing Generating CMU Thornhill CCGT Thornhill OCGT +4 more WF12
Active • 2029-30 (T-4), 2028-29 (T-4) ...
186.19 MW
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Cleveland, TS2 1UB (12 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
173.55 MW
Baglan Bay Power Station, Baglan Energy Park, Port Talbot, SA12 7GE (18 components)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT
• Existing CCGT Baglan Unit 1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Basin Road South, Portslade, East Sussex, BN41 1WF (13 components)
• Combined Cycle Gas Turbine plant
• Existing Combined Cycle Gas Turbine plant
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Shoreham Shoreham +4 more BN41
Active • 2029-30 (T-4), 2028-29 (T-4) ...
1157.52 MW
Basin Road South. Portslade. East Sussex. BN41 1WF (13 components)

Combined Cycle Gas Turbine plant (3)

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Shoreham Shoreham +1 more BN41
Active • 2029-30 (T-4), 2028-29 (T-4) ...
1157.52 MW
Brentfield Road Willesden London NW10 8JP (24 components)
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Diesel) UNIPER UK LIMITED Existing Generating CMU Taylor's Lane GT2 (99MW TEC) Taylor's Lane GT3 (99MW TEC) NW10
Active • 2029-30 (T-4), 2028-29 (T-4) ...
525.46 MW
Brentfield Road, Willesden, London, NW10 8JP (24 components)
• Taylor's Lane OCGT GT Unit 2 This unit is fuelled by Gas Oil as specified by BS 6892 Class A2 Please see letter uploaded to metering section to explain determination of Connection Capacity
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2
Active • 2029-30 (T-4), 2028-29 (T-4) ...
525.46 MW
Burghfield Mini Power Plant, Cottage Lane, Pingewood, Reading, RG30 3UW (17 components)

1 x OCGT

Active • 2029-30 (T-4), 2028-29 (T-4) ...
266.27 MW
Carrington Power Station, 132 Manchester Road, Carrington, Manchester, M31 4AY, United Kingdom (30 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3318.50 MW
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (11 components)

Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (28 components)
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) UNIPER UK LIMITED Existing Generating CMU Killingholme Module 1 Killingholme Module 1 (GCA) +4 more DN40
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2351.11 MW
Chase Hill Road, Killingholme, North Lincolnshire, DN40 3LU (28 components)
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 1 converted to open cycle operation please see letter uploaded in metering section that explains determination of three highest HH periods
• Killingholme Module 1 converted to open cycle operation please see letter uploaded to metering section that describes determination of three highest HH, together with Grid Connection Agreement
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2351.11 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (13 components)
Reciprocating engines Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_CHEGT1 CMU_CHEGT1 +2 more CH65
Active • 2029-30 (T-4), 2028-29 (T-4) ...
287.68 MW
Cheshire Power Station, North Road, Ellesmere Port, South Wirral, CH65 1AF (13 components)
• Modular reciprocating engines
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2029-30 (T-4), 2028-29 (T-4) ...
287.68 MW
Loading map...
Showing 25 locations