Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

19 unique locations (167 components)

1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (4 components)
• Combined Cycle Gas Turbine
• Combined Cycle Gas Turbine plant
• Gas fired reciprocating engine(s)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
978.65 MW
1 Ratty's Lane, Hoddesdon, Hertsfordshire, EN11 0RF (2 components)
• Combined Cycle Gas Turbine
• Water treatment centre
Inactive • 2022-23 (T-3), 2020-21 (T-4)
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 0RF (2 components)

Combined Cycle Gas Turbine

Inactive • 2022-23 (T-4)
643.50 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (35 components)
• EV charging at residential premises
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.10 MW
Basin Road South, Portslade, East Sussex, BN41 1WF (4 components)

Combined Cycle Gas Turbine plant

Active • 2028-29 (T-4), 2023-24 (T-4) ...
573.24 MW
Basin Road South. Portslade. East Sussex. BN41 1WF (6 components)
• Combined Cycle Gas Turbine plant
• N/A
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
186.15 MW
Burning Ground Site Kingsnorth Works Industrial Estate Hoo Rochester ME3 9NZ (6 components)
• Gas reciprocating engines
• Little Barford 1 CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2022-23 (T-4) ...
95.86 MW
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (14 components)
• Combined Cycle Gas Turbine
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.26 MW
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (9 components)
• A new Combined Cycle Gas Turbine unit (unit 4) at Damhead Creek 2 power plant
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
• Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5480.84 MW
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (3 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Combined Cycle Gas Turbine plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (12 components)
• Combined Cycle Gas Turbine plant
• Energy Centre comprising of lean burn acoustically treated natural gas reciprocating engines
• New build Combined Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1887.09 MW
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (6 components)
• 1 x hydro turbine & synchronous generator
• New build Open Cycle Gas Turbine plant
• bus depot
Active • 2026-27 (T-4), 2024-25 (T-4) ...
1557.00 MW
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP18DC) (2 components)
• Gas fired generating units
• New build Combined Cycle Gas Turbine plant
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land adjacent to Haydock Cross Industrial Estate Kilbuck Lane Haydock WA11 9SR (3 components)
• Gas engine system capable of exporting electricity.
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
Inactive • 2022-23 (T-3), 2018-19 (T-1)
Land off Nobel Road, Wester Gourdie Industrial Estate, Dundee, DD2 4UH (13 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Combined Cycle Gas Turbine plant
• Gas fuelled Generating Sets
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
9.45 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (14 components)
• 5MW of demand reduction
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
220.53 MW
Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (2 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (18 components)
• Combined Cycle Gas Turbine
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
• Pembroke 51 - CCGT MSID: 7237
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.87 MW
Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (12 components)
• 8MW Energy Storage facility located in Harrogate.
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• New build Combined Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 19 locations