Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

8 unique locations (86 components)

Tyseley, Hay Hall Road, Tyseley, B11 2AU (2 components)
• Connah's Quay PS Unit 2 CCGT
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2020-21 (T-4)
Trent Basin Nottingham NG2 4DS (3 components)
• A 0.5MW Lithium Ion Battery based in Nottingham
• Connah's Quay PS Unit 1 CCGT
Inactive • 2022-23 (T-4), 2018-19 (T-1)
Salford Lodge Pitchill Evesham WR11 8SN (3 components)
• 0.1MW Tesla battery located at Eversham
• Connah's Quay PS Unit 1 CCGT
Inactive • 2022-23 (T-4), 2018-19 (T-1)
M1, Luton, LU5 6HR (2 components)
• Connah's Quay PS Unit 4 CCGT
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Inactive • 2023-24 (T-4), 2022-23 (T-4)
47.02 MW
Lakeside EfW, Lakeside Road, Colnbrook, SL3 0FE (14 components)
• Connah's Quay PS Unit 4 CCGT
• Energy from Waste Facility
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (46 components)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2714.06 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (13 components)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• CMU consisting of a gas reciprocating engine and alternator
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.70 MW
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (3 components)
• Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Connah's Quay PS Unit 3 CCGT
Active • 2028-29 (T-4), 2022-23 (T-4)
0.11 MW
Loading map...
Showing 8 locations