Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (2 components)

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones …

Inactive • 2023-24 (T-4)
488.34 MW
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (58 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6623.53 MW
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (39 components)
• Didcot B5 - CCGT MSID: 4055
• Didcot B6 - CCGT
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4732.58 MW