Combined Cycle Gas Turbine (CCGT)

5 unique locations (92 components)

3678.80 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (14 components)
• 5MW of demand reduction
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
220.53 MW
Land off Amy Johnson Way, Blackpool, FY4 2RS (14 components)
• A gas fuelled generating station.
• Connah's Quay PS Unit 1 CCGT
• Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
Active • 2028-29 (T-4), 2023-24 (T-4) ...
6.54 MW
Asda Greengates, 147 New Line , Bradford, BD10 0BT (12 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment from refridgeration
• Pembroke 41 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2025-26 (T-4) ...
13.36 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane , Wolverhampton, WV10 9QD (30 components)
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW