Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (22 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.93 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (27 components)
• A gas fuelled generating station.
• Generators at hospital site
• Peterhead CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6471.35 MW
Land off Sookholme Road, Vernon Street Industrial Estate, Shirebrook, Mansfield, NG20 8SG (24 components)
• Reciprocating genset
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.56 MW
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (31 components)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Lithium ion battery storage plant
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
134.94 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (56 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4657.99 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...