Combined Cycle Gas Turbine (CCGT)

2 unique locations (25 components)

Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
762.63 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (13 components)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• CMU consisting of a gas reciprocating engine and alternator
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.70 MW