Combined Cycle Gas Turbine (CCGT)

22 unique locations (916 components)

Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (33 components)
โ€ข A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
โ€ข Existing CCGT
โ€ข The CMU is a gas fired CCGT CHP
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
207.86 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (22 components)
โ€ข Energy facility comprising of reciprocating engine sets and ancillary equipment.
โ€ข Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
3.93 MW
Weir Minerals, Halifax Rd, Todmorden OL14 5RT, United Kingdom (21 components)
โ€ข A gas fuelled generating station.
โ€ข Existing CCGT
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
8.16 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (16 components)
โ€ข Existing CCGT
โ€ข Existing CCGT to be refurbished
โ€ข Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
Active โ€ข 2028-29 (T-4), 2026-27 (T-4) ...
1474.81 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (60 components)
โ€ข Staythorpe 1 - CCGT MSID: 7210
โ€ข Staythorpe 2 - CCGT MSID: 7210
โ€ข Staythorpe 4 - CCGT MSID: 7210
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
6050.24 MW
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
โ€ข Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
โ€ข Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
โ€ข Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Saltend Lane, HULL, HU12 8PP (33 components)
โ€ข Load reduction
โ€ข Load reduction on site
โ€ข On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active โ€ข 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
โ€ข Pembroke 21 - CCGT MSID: 7237
โ€ข Pembroke 41 - CCGT MSID: 7237
โ€ข Pembroke 51 - CCGT MSID: 7237
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
6359.67 MW
Pattinson North Ind. Estate, Alston Rd, Washington, NE38 8QH, United Kingdom (42 components)
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
โ€ข The CMU is a combined cycle gas turbine
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
25.02 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
โ€ข The CMU is a Open Cycle Gas Turbine (OCGT)
โ€ข The CMU is a combined cycle gas turbine
โ€ข The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active โ€ข 2028-29 (T-4), 2026-27 (T-4) ...
2527.80 MW
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
โ€ข Refurbishment Unit 4 Cruachan pump storage hydro plant
โ€ข Unit 1 Cruachan pumped storage hydro plant
โ€ข Unit 2 Cruachan pumped storage hydro plant
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
827.61 MW
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (59 components)
โ€ข Keadby 1 CCGT
โ€ข Keadby GT3
โ€ข New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
5902.68 MW
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (5 components)
โ€ข Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข Single combined cycle gas turbine with supplementary firing
Active โ€ข 2024-25 (T-4), 2022-23 (T-3) ...
369.00 MW
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (51 components)
โ€ข Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW
โ€ข Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
12.25 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (125 components)
โ€ข Aux. load separately metered
โ€ข Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
โ€ข GT8
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
31264.81 MW
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (19 components)
โ€ข The CMU is a Open Cycle Gas Turbine (OCGT)
โ€ข The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
โ€ข West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
Active โ€ข 2024-25 (T-4), 2023-24 (T-4) ...
1246.05 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
โ€ข CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
โ€ข The CMU component is a combined cycle gas turbine
โ€ข one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
3488.59 MW
Ardagh Group - Barnsely Site 1, Burton Road, Monk Bretton South Yorkshire S71 5RP (15 components)
โ€ข Gas-fired CHP unit
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข Load reduction on site supported by non-exporting standby generation.
Active โ€ข 2028-29 (T-4), 2025-26 (T-4) ...
16.24 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane ,ย Wolverhampton, WV10 9QD (30 components)
โ€ข Gas fired reciprocating engines.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
โ€ข E1000 CHP
โ€ข Existing CCGT
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active โ€ข 2026-27 (T-4), 2024-25 (T-4) ...
2435.45 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (35 components)
โ€ข EV charging at residential premises
โ€ข Operational Reciprocating Engine
โ€ข Operational gas reciprocating engine.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
15.10 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (13 components)
โ€ข 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
โ€ข One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
โ€ข Poole Existing Site CHP
Active โ€ข 2027-28 (T-4), 2024-25 (T-4) ...
1763.05 MW
Loading map...