Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

3 unique locations (74 components)

Seabank Power Limited Severn Road, Hallen Bristol BS10 7SP (17 components)

Multi Shaft CCGT (Module 1)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
2171.63 MW
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (13 components)
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-19= 100% T_WBURB-3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1246.05 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (44 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3471.17 MW
Loading map...
Showing 3 locations