Combined Cycle Gas Turbine (CCGT)

25 unique locations (575 components)

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (33 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT
• The CMU is a gas fired CCGT CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.86 MW
Wheldale 1 Wheldale Generation Site Wheldale Road Castleford West Yorkshire WF10 2RR (6 components)
• Milling Motor Pelletizers, Fans etc
• New build Combined Cycle Gas Turbine unit 1 at Eggborough power station.
• load curtailment at site
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (6 components)
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• West Burton A Power Station CMU 4 WA4-19= 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2026-27 (T-4), 2023-24 (T-4) ...
1722.73 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (22 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.93 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (30 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2330.50 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)
• A gas engine CHP site providing hot water to a local district heating network
• Didcot B5 - CCGT MSID: 4055
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.68 MW
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (18 components)
• Combined Cycle Gas Turbine
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
• Pembroke 51 - CCGT MSID: 7237
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.87 MW
Saltend Lane, HULL, HU12 8PP (33 components)
• Load reduction
• Load reduction on site
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (16 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Load reduction on site supported by non-exporting standby generation.
• Two gas CHP in a horticultural environment with no aux load
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SF (15 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Multi Shaft CCGT (Module 1)
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Manchester Rd, Carrington, Manchester M31 4TG (33 components)
• 2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
12.59 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (32 components)
• 49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3881.97 MW
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (53 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT Unit
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (17 components)
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
• Connah's Quay PS Unit 1 CCGT
Active • 2026-27 (T-4), 2025-26 (T-4) ...
156.98 MW
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (18 components)
• Dungeness B Power Station CMU 22: [DN2222] T_DNGB22 + (50% x T_DNGB-D)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
765.00 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (16 components)
• 10 x 1mw gas generator units to be installed on designated land at Burghfield Road Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• Existing CCGT
• One CHP, generating for site load which exceeds generating capacity. No aux load.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Inverawe Power Station, Inverawe, by Taynuilt, Argyll, PA35 1HU (24 components)
• 1 x hydro turbine & synchronous generator
• 1x hydro turbine & synchronous generator
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
91.46 MW
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW. (10 components)
• EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
• Load reduction on site supported by non-exporting standby generation.
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1764.84 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (56 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4657.99 MW
Beach Esplanade, Aberdeen AB24 5NR (12 components)
• Battery Storage Plant
• CMU consisting of multiple reciprocating engines and alternators
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
4.36 MW
Asda Greengates, 147 New Line , Bradford, BD10 0BT (12 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment from refridgeration
• Pembroke 41 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2025-26 (T-4) ...
13.36 MW
Asda Dyce, Cairnton Road, Boyndie, Banffshire, AB45 2LR (8 components)
• Didcot B6 - CCGT MSID: 4055
• New Build gas fuelled generation station.
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
20.43 MW
Loading map...