Combined Cycle Gas Turbine (CCGT)

40 unique locations (468 components) - Page 1 of 2

Active MW: 229775.30 MW
Inactive MW: 33894.12 MW
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (6 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. Metering of output is Net of auxillary load.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
Combined Cycle Gas Turbine (CCGT) Willington Power Limited New Build Generating CMU WILLINGTON C CCGT WILLINGTON C CCGT +1 more Conditional DE65
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4307.40 MW
Weston Point CHP, INEOS Salt Works, Mersey View Road, Weston Point, Runcorn, WA7 4HB (10 components)

1 x OCGT

Open Cycle Gas Turbine (OCGT) SSE ENERGY SUPPLY LIMITED Existing Generating CMU Weston Point CHP Weston Point CHP +2 more WA7
Active • 2025-26 (T-4), 2024-25 (T-4) ...
34.78 MW
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (20 components)
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4991.87 MW
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
• A new 299MW Open Cycle Gas Turbine peaking plant
• A new Open Cycle Gas Turbine peaking plant
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) HIRWAUN POWER LIMITED New Build Generating CMU Hirwaun Power OCGT Hirwaun Power OCGT +2 more CF44
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1136.65 MW
38.04 MW
Ty Coch Farm Greenfield Holywell CH87HT (8 components)

Gas fuelled generation plant (3)

Open Cycle Gas Turbine (OCGT) PINXTON ENERGY LIMITED TY COCH ENERGY LIMITED New Build Generating CMU PIN111 TYC111 Conditional CH8
Active • 2024-25 (T-4), 2023-24 (T-4) ...
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure

Open Cycle Gas Turbine (OCGT) GAS GENERATION BURNLEY LIMITED New Build Generating CMU Gas Generation Burnley 2 Gas Generation Burnley 2 +2 more BB12
Active • 2024-25 (T-4), 2023-24 (T-4) ...
22.82 MW
The Manorway, Stanford-le-Hope, Essex, SS17 9LP (11 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
884.02 MW
Site of the former Teesside Power Station, Greystone Road, Grangetown, Middlesbrough, TS6 8JF (2 components)

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones …

Active • 2024-25 (T-4), 2023-24 (T-4)
976.68 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (8 components)

Gas fuelled CHP generation plant

Active • 2027-28 (T-4), 2025-26 (T-4) ...
28.50 MW
Seals Sands Power Station, North South Access Road, Seal Sands, Middlesbrough, TS2 1FB (5 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
162.00 MW
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (5 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) PROGRESS POWER LIMITED New Build Generating CMU Progress Power OCGT Progress Power OCGT +2 more IP23
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1136.65 MW
New Hall Farm School Lane Birchwood Warrington WA3 6LH (3 components)

New Gas fulled generation station

Open Cycle Gas Turbine (OCGT) NEW HALL FARM ENERGY LIMITED New Build Generating CMU NHF111 Rejected WA3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.70 MW
Millbrook Power Station, Rookery South Pit, Green Lane, Stewartby, Bedfordshire MK43 9LX (3 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Open Cycle Gas Turbine (OCGT) MILLBROOK POWER LIMITED New Build Generating CMU Millbrook Power OCGT Millbrook Power OCGT MK43
Active • 2024-25 (T-4), 2023-24 (T-4) ...
568.70 MW
Meaford Energy Centre, Meaford Business Park, Meaford Road, Meaford, Staffordshire, ST15 8UZ (4 components)

Gas Fired Generating Station

Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) Meaford Energy Limited New Build Generating CMU Meaford Generating Station Meaford Generating Station +2 more ST15
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1127.15 MW
Lynchford Lane, Farnborough, GU14 6LW (4 components)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Open Cycle Gas Turbine (OCGT) Gas Generation Buckland Road Limited New Build Generating CMU Gas Generation Farnborough Gas Generation Farnborough +2 more Conditional GU14
Active • 2024-25 (T-4), 2023-24 (T-4) ...
75.68 MW
Land off Well Street, Paisley, PA1 2QH (4 components)

4 gas reciprocating engines used for power generation, with associated infrastructure.

Open Cycle Gas Turbine (OCGT) GAS GENERATION PROPERTY LIMITED New Build Generating CMU Gas Generation Paisley 1 Gas Generation Property +2 more PA1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
30.43 MW
Land adjacent to Brynfyrd Botley Road Romsey SO52 9DP (3 components)

Gas fuelled generation plant

Open Cycle Gas Turbine (OCGT) BOTLEY ENERGY LIMITED New Build Generating CMU BOT111 SO52
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (8 components)
• Combined Cycle Gas Turbine plant
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
OCGT Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED New Build Generating CMU Damhead Creek Damhead Creek +4 more ME3
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
5410.60 MW
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (2 components)

Combined Cycle Gas Turbine plant

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Damhead Creek ME3
Inactive • 2023-24 (T-4), 2022-23 (T-3)
724.50 MW
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (9 components)
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
• New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.
Combined Cycle Gas Turbine (CCGT) EP UK POWER DEVELOPMENT LTD New Build Generating CMU King's Lynn B King's Lynn B +4 more PE34
Active • 2025-26 (T-4), 2024-25 (T-4) ...
6895.24 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (73 components)
• GT3
• Generating Unit 1
• Generating Unit 2
Active • 2025-26 (T-4), 2024-25 (T-4) ...
7352.06 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (52 components)
• GT5
• GT8
• Unit 4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW. (8 components)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Combined Cycle Gas Turbine (CCGT) EP LANGAGE LIMITED Existing Generating CMU T_LAGA-1 PL7
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2269.66 MW
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (5 components)

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Combined Cycle Gas Turbine (CCGT) EP UK Power Development II Ltd Existing Generating CMU South Humber Bank DN41
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1260.00 MW