Combined Cycle Gas Turbine (CCGT)

14 unique locations (264 components)

Lowfields Way, Lowfields Business Park, HX5 9DA (5 components)
• Connah's Quay PS Unit 3 CCGT
• New build battery storage
• New build generating storage unit
Active • 2028-29 (T-4), 2023-24 (T-1) ...
66.79 MW
LAND ON BREDBURY WAY STOCKPORT SK6 2TF (6 components)
• CMU consisting of multiple gas reciprocating engines and alternators
• Connah's Quay PS Unit 3 CCGT
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
4.76 MW
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (14 components)
• Combined Cycle Gas Turbine
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.26 MW
Huntsman Drive, Seal Sands, TS2 1TT (4 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …

Inactive • 2023-24 (T-1)
96.45 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (125 components)
• Aux. load separately metered
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• GT8
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31264.81 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (13 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
• New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site
Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.19 MW
Asda Tain, Knockbreck Road , Tain, IV19 1LX (11 components)
• Didcot B5 - CCGT MSID: 4055
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
705.70 MW
Asda Greengates, 147 New Line , Bradford, BD10 0BT (12 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment from refridgeration
• Pembroke 41 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2025-26 (T-4) ...
13.36 MW
Asda Glasshoughton, Leeds Road WF10 5EL (8 components)
• Didcot B6 - CCGT
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
22.46 MW
Asda Coventry, Brade Drive, Walsgrave, CV2 2PN (11 components)
• Cottam Development Centre (CDC) CCGT single unit station
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
418.03 MW
Asda Brierley Hill, Pearson Street, Dudley, DY5 3BJ (11 components)
• Enfield CCGT Power Station - (one unit station)
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
415.30 MW
Asda Boldon, North Road, Boldon Colliery, NE35 9AR (11 components)
• Load curtailment
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2025-26 (T-4) ...
278.88 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (17 components)
• Keadby 1 CCGT
• The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
721.35 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
20.43 MW
Loading map...
Showing 14 locations