Combined Cycle Gas Turbine (CCGT)

5 unique locations (156 components)

Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
2435.45 MW
Asda Boston, Pudding Lane Spalding, Lincs, PE11 3TJ (7 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Load curtailment at site via standby generation
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (19 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1246.05 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (30 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2330.50 MW
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (10 components)
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
720.00 MW