Combined Cycle Gas Turbine (CCGT)

16 unique locations (264 components)

WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)
• A gas engine CHP site providing hot water to a local district heating network
• Didcot B5 - CCGT MSID: 4055
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.68 MW
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (5 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• Aggregate CMU from Multiple Sources
• Didcot B5 - CCGT
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.70 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (14 components)
• Existing CCGT Unit
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2025-26 (T-1) ...
773.08 MW
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (5 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (18 components)
• Combined Cycle Gas Turbine
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
• Pembroke 51 - CCGT MSID: 7237
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.87 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (32 components)
• 49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3881.97 MW
Land at Stanhope Industrial Estate, Wharf Road, Standford-Le-Hope SS17 0EH (17 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
• 5 x 2MW Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear at Stanhope industrial Estate
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26 (T-4), 2024-25 (T-4) ...
85.66 MW
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
136.00 MW
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (3 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (6 components)
• Great Yarmouth 1 - CCGT
• Great Yarmouth 1 - CCGT MSID: 7111
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
39.91 MW
Burning Ground Site Kingsnorth Works Industrial Estate Hoo Rochester ME3 9NZ (6 components)
• Gas reciprocating engines
• Little Barford 1 CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2022-23 (T-4) ...
95.86 MW
Beach Esplanade, Aberdeen AB24 5NR (12 components)
• Battery Storage Plant
• CMU consisting of multiple reciprocating engines and alternators
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
4.36 MW
Asda Greengates, 147 New Line , Bradford, BD10 0BT (12 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment from refridgeration
• Pembroke 41 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2025-26 (T-4) ...
13.36 MW
Asda Glasshoughton, Leeds Road WF10 5EL (8 components)
• Didcot B6 - CCGT
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
22.46 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
2435.45 MW
Loading map...
Showing 16 locations