Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

63 unique locations (622 components) - Page 1 of 3

132 Manchester Road, Carrington, Manchester, M31 4AY (13 components)
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
• Poole Existing Site CHP
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1763.05 MW
1 Ratty's Lane, Hoddesdon, Hertsfordshire, EN11 0RF (2 components)
• Combined Cycle Gas Turbine
• Water treatment centre
Inactive • 2022-23 (T-3), 2020-21 (T-4)
4 Finway Road Hemel Hempstead HP2 7PT (11 components)
• 14.710 MW CHP generation
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2024-25 (T-4), 2022-23 (T-3) ...
4.76 MW
Amy Johnson Way Blackpool FY4 2RP (2 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 1.5MW together with transformers, switchgear and associated control gear
• Existing CCGT Unit
Inactive • 2022-23 (T-3), 2021-22 (T-4)
Ardagh Group - Barnsely Site 1, Burton Road, Monk Bretton South Yorkshire S71 5RP (15 components)
• Gas-fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
16.24 MW
Asda Boston, Monument Road, Bicker, Lincolnshire PE20 3DJ (6 components)
• A new build 11MW battery storage system
• A new build gas fuelled generating station.
• Great Yarmouth 1 - CCGT MSID: 7111
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Asda Boston, Pudding Lane Spalding, Lincs, PE11 3TJ (7 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Load curtailment at site via standby generation
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Ponders End, Iceland Foods 5 Solar Way Innova Park Brimsdown Enfield EN3 7XY (5 components)
• A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
• Mix of load reduction and standby generation
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Auchencrosh Converter Station, Glenapp Estate, Ballantrae, Girvan, KA26 0NY (6 components)
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
• Peterhead CCGT
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
140.00 MW
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (27 components)
• A gas fuelled generating station.
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT Baglan Unit 1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
428.74 MW
Basin Road South, Portslade, East Sussex, BN41 1WF (4 components)

Combined Cycle Gas Turbine plant

Active • 2028-29 (T-4), 2023-24 (T-4) ...
573.24 MW
Basin Road South. Portslade. East Sussex. BN41 1WF (6 components)
• Combined Cycle Gas Turbine plant
• N/A
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
186.15 MW
Beach Esplanade, Aberdeen AB24 5NR (12 components)
• Battery Storage Plant
• CMU consisting of multiple reciprocating engines and alternators
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
4.36 MW
Brook Farm, Ploughley Road, Lower Arncott, OX25 1NY See attached location note (1 component)

Cottam Development Centre (CDC) CCGT single unit station

Inactive • 2022-23 (T-3)
BS23 0AP (11 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8.99MW.
• Existing CCGT unit
• Water treatment centre
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Challenge Way, Blackburn, Lancashire BB1 5QB (2 components)
• Connah's Quay PS Unit 4 CCGT
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2025-26 (T-4), 2022-23 (T-3)
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (11 components)
• 4 x reciprocating engines
• A 20MW New Build Battery Storage site
• CHP Unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cottam Development Centre Power Station Cottam Retford DN22 0TF (6 components)
• CHP on a hospital site
• CMU consisting of multiple reciprocating engines and alternators
• Cottam Development Centre (CDC) CCGT single unit station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
138.91 MW
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ (3 components)

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near …

Inactive • 2022-23 (T-3), 2017-18 (T-1)
145.42 MW
Drakelow Power Station, Burton on Trent, DE15 9TZ (3 components)

The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
175.50 MW
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (19 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1246.05 MW
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (6 components)

EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
252.00 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (13 components)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• CMU consisting of a gas reciprocating engine and alternator
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.70 MW
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (10 components)
• Great Yarmouth 1 - CCGT MSID: 7111
• Indian Queens Power Station
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1566.23 MW
Loading map...
Showing 25 locations