Combined Cycle Gas Turbine (CCGT)

10 unique locations (75 components)

Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (5 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• Aggregate CMU from Multiple Sources
• Didcot B5 - CCGT
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (7 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
55.09 MW
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (7 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery Project on Greenfield Site
• New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation
Active • 2028-29 (T-4), 2024-25 (T-1) ...
48.57 MW
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (7 components)
• Didcot B5 - CCGT
• Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary Infrastructure including Access Roads, Weighbridges, Fencing/Gates, Lighting, Emissions Stack, Surface Water Drainage Basins and Landscaping.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (10 components)
• Great Yarmouth 1 - CCGT MSID: 7111
• Indian Queens Power Station
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1566.23 MW
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (6 components)
• Great Yarmouth 1 - CCGT
• Great Yarmouth 1 - CCGT MSID: 7111
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
39.91 MW
Asda Dyce, Cairnton Road, Boyndie, Banffshire, AB45 2LR (8 components)
• Didcot B6 - CCGT MSID: 4055
• New Build gas fuelled generation station.
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
Asda Boston, Monument Road, Bicker, Lincolnshire PE20 3DJ (6 components)
• A new build 11MW battery storage system
• A new build gas fuelled generating station.
• Great Yarmouth 1 - CCGT MSID: 7111
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Loading map...
Showing 10 locations