Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (10 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
720.00 MW
Wheldale 1 Wheldale Generation Site Wheldale Road Castleford West Yorkshire WF10 2RR (6 components)
• Milling Motor Pelletizers, Fans etc
• New build Combined Cycle Gas Turbine unit 1 at Eggborough power station.
• load curtailment at site
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (6 components)
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• West Burton A Power Station CMU 4 WA4-19= 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2026-27 (T-4), 2023-24 (T-4) ...
1722.73 MW
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (16 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Load reduction on site supported by non-exporting standby generation.
• Two gas CHP in a horticultural environment with no aux load
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (53 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT Unit
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (16 components)
• 10 x 1mw gas generator units to be installed on designated land at Burghfield Road Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• Existing CCGT
• One CHP, generating for site load which exceeds generating capacity. No aux load.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Asda Ponders End, Iceland Foods 5 Solar Way Innova Park Brimsdown Enfield EN3 7XY (5 components)
• A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
• Mix of load reduction and standby generation
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Asda Dyce, Cairnton Road, Boyndie, Banffshire, AB45 2LR (8 components)
• Didcot B6 - CCGT MSID: 4055
• New Build gas fuelled generation station.
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
Asda Boston, Pudding Lane Spalding, Lincs, PE11 3TJ (7 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Load curtailment at site via standby generation
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Asda Boston, Monument Road, Bicker, Lincolnshire PE20 3DJ (6 components)
• A new build 11MW battery storage system
• A new build gas fuelled generating station.
• Great Yarmouth 1 - CCGT MSID: 7111
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...