Combined Cycle Gas Turbine (CCGT)

10 unique locations (72 components)

Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (5 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• Aggregate CMU from Multiple Sources
• Didcot B5 - CCGT
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Solway Trading Estate Maryport Cumbria CA15 8NF (4 components)
• Connah's Quay PS Unit 2 CCGT
• New build power station comprised of multiple reciprocating engines.
Inactive • 2022-23 (T-3), 2020-21 (T-1) ...
Land off Nobel Road, Wester Gourdie Industrial Estate, Dundee, DD2 4UH (13 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Combined Cycle Gas Turbine plant
• Gas fuelled Generating Sets
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
9.45 MW
Lakeside EfW, Lakeside Road, Colnbrook, SL3 0FE (14 components)
• Connah's Quay PS Unit 4 CCGT
• Energy from Waste Facility
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (4 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
547.88 MW
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (2 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (7 components)
• Didcot B5 - CCGT
• Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary Infrastructure including Access Roads, Weighbridges, Fencing/Gates, Lighting, Emissions Stack, Surface Water Drainage Basins and Landscaping.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Haverton Hill Road Stockton-on-Tees Billingham TS23 1PS (5 components)
• Existing CCGT to be refurbished
• New build power station comprised of multiple reciprocating engines.
• Power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2019-20 (T-1) ...
2.83 MW
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (15 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
363.08 MW