Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

250 unique locations (3968 components) - Page 9 of 10

Cardiff Road, Barry, Vale of Glamorgan, CF63 2YL (10 components)

Gas Turbine CHP GT001A

Active • 2026-27 (T-4), 2023-24 (T-4) ...
5.88 MW
Cannon Wharf CHP, Yeoman Street, London, SE8 5DT (10 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.57 MW
Caernarfon Brick Works, Seiont Mill Road, Caernarfon, LL55 2YL (2 components)

New-Build CHP Generating Unit at Seoint Quarry, Caernarfon.

Active • 2028-29 (T-4)
36.38 MW
1.65 MW
267.94 MW
Burnside Mills, Kendal,Cumbria,LA9 6PZ (10 components)

Gas fired CHP unit

Active • 2026-27 (T-4), 2025-26 (T-4) ...
27.19 MW
Broadgreen Hospital, Thomas Drive, Liverpool L14 3LB (14 components)
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity of 1.949 MW
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.133 MW.
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.200 MW and total net power capacity of 2.181 MW
Active • 2025-26 (T-1), 2023-24 (T-4) ...
1.64 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA. (20 components)
• existing on site CHP
• existing onsite CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
140.57 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (23 components)
• existing CHP on site.
• existing on site CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
145.08 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (38 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
178.50 MW
52.75 MW
Briar Chemicals, Sweet Briar Rd, Norwich NR6 5AP (1 component)

Behind the Meter CHP Unit

Active • 2025-26 (T-1)
1.82 MW
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (19 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS

Active • 2027-28 (T-4), 2026-27 (T-4) ...
466.74 MW
Birmingham Children?s Hospital, Steelhouse Lane, Birmingham, B4 6NH (7 components)

1.6MW Combined Heat and Power Plant at Birmingham Children Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.51 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (3 components)

2025kW gas engine

Active • 2028-29 (T-4), 2025-26 (T-1) ...
5.54 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (4 components)

2025 KW gas fire engine

Active • 2028-29 (T-4), 2025-26 (T-1) ...
9.25 MW
Beach Esplanade, Aberdeen AB24 5NR (14 components)

District heating implementation with one asset 1MW and no auxiliary load

Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.09 MW
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH (16 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.63 MW
Bath CHP, Midland Road, Bath, BA2 3EW (13 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.72 MW
Barrow Man Road Birchington Kent CT7 0AX (13 components)
• Two CHP engines in horticultural environment with no auxilliary load
• Two 2.7MW CHP engines. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.46 MW
Barrier Park CHP, North Woolwich Road, Silvertown, London, E16 2HP (13 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.70 MW
Barrack Road, Exeter, EX2 5DW. (7 components)

1.521 MW CHP unit

Active • 2026-27 (T-4), 2024-25 (T-4) ...
6.56 MW
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (6 components)

on site generating CMU

Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.99 MW
Aventine Way, Glebe Farm Industrial Estate, Rugby, CV21 1HA (23 components)

A gas CHP supplying a manufacturing facility

Active • 2027-28 (T-4), 2025-26 (T-4) ...
6.95 MW
Loading map...
Showing 25 locations