211 unique locations (1803 components) - Page 9 of 9

UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST, GLENFIELD CLINIC, GROBY ROAD, LEICESTER, LE3 9QP (10 components)
• A 20MW New Build gas fuelled generating station.
• CHP plant
• New build battery
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Uskmouth Power Station, West Nash Road, Nash, Newport, Gwent NP18 2BZ (9 components)
• 2MW (1 X 2 MW diesel gensets )
• One CHP engine in a horticultural environment with no auxilliary load.
• The CMU is a coal-fired set in the Uskmouth power station. This is a mothballed set for which TEC may be sought. As the connection agreement shows, the site has the CEC to export to this quantity, but it will be a matter of securing TEC (of some form) if this set is to come back on the bars.
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
66.64 MW
Warrington Hospital, Lovely Lane, Warrington, Cheshire WA5 1QG (1 component)

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
Warrington Hospital, Lovely Lane, Warrington, CheshireWA5 1QG (1 component)

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
Warrington Hospital, Lovely Lane, Warrington, Cheshire WA5 1QG (2 components)

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
Warrington Hospital, Lovely Lane, Warrington, CheshireWA5 1QG (2 components)

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (23 components)
• On-site existing CHP generating unit
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
37.31 MW
Wight Salads Arreton Newport Isle of Wight PO30 3AR (3 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Inactive • 2023-24 (T-1), 2022-23 (T-3) ...
5.48 MW
Wight Salads Arreton Newport Isle of Wight PO30 3AR (5 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (10 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
720.00 MW
Windsor Road, Redditch, Worcestershire, B97 6EF (9 components)
• 2026 kW CHP unit
• A Battery Energy Storage System
• The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...