Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

250 unique locations (3968 components) - Page 9 of 10

Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (5 components)

One 2MW gas CHP engine in a horticultural environment

Active • 2027-28 (T-4), 2024-25 (T-1) ...
8.82 MW
Snodland Paper Mill, Mill Street, Snodland, Kent, ME6 5AX (7 components)

On-site Generating CMU.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
66.35 MW
Solenis, Cleckheaton Road, Low Moor, Bradford, United Kingdom, BD12 0JZ (15 components)
• Gas Turbine CHP unit
• Steam turbine
Active • 2025-26 (T-1), 2024-25 (T-1) ...
30.30 MW
Solvay, Trinity St, Oldbury, B69 4LW (12 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
11.32 MW
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (13 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 MW.
• 2X gas reciprocating engines with a total gross power capacity of 3.973 MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.63 MW
Southdownview Way, Worthing, West Sussex, BN14 8QH (15 components)

CHP and autogeneration

Active • 2024-25 (T-4), 2023-24 (T-4) ...
6.35 MW
Southport & Formby District General Hospital, Town Lane Kew, Southport PR8 6PN (2 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.995 MW and a net power capacity of 0.961 MW

Active • 2028-29 (T-4), 2025-26 (T-1)
1.73 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (19 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
48.51 MW
Speke Blvd, Speke, Liverpool L24 9LE (7 components)
• On-site Generating CMU
• on site generating CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
32.45 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (5 components)

Gas Fired CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
12.67 MW
Staithes Road, Preston, Hull, HU12 8TB (35 components)
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.83 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (12 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.69 MW
Station Road, Wigton, Cumbria CA7 9BG (60 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2025-26 (T-4), 2024-25 (T-4) ...
57.56 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (37 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
23.13 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (23 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.44 MW
Stoneykirk Road, Stranraer, DG9 7BU (23 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
12.50 MW
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (9 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2024-25 (T-4) ...
4.35 MW
Syensqo Oldbury, Trinity St, Oldbury, B69 4LN (1 component)

Existing Generation on existing site - CHP

Active • 2025-26 (T-4)
8.80 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.33 MW
19.34 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (9 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2023-24 (T-4) ...
11.64 MW
Thearne Lane Woodmansey Beverley HU17 0SA (6 components)

Two gas CHP engines in commercial horticultural environment with no auxilliary load

Active • 2025-26 (T-4), 2023-24 (T-4) ...
1.13 MW
Thearne Lane, Woodmansey, Beverley, North Humberside, HU17 0SA (4 components)

2 x CHP at a horticultural site

Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.35 MW
The fields close to Chear Farm Bungalow, Ely Road, Chittering, Cambridge, CB25 9PN (4 components)
• FENGEN (CMU) is a load reduction asset using lighting and battery energy storage (BESS) for growing of vegetables on an industrial scale.
• FENGH2 (CMU) is a new build generating 06.000MW gas fired CHP plant.
Active • 2028-29 (T-4)
12.92 MW
Loading map...
Showing 25 locations