211 unique locations (1803 components) - Page 5 of 9

Leicester Royal Infirmary, Infirmary Square, Leicester, LE1 5WW (9 components)
• CHP Unit
• Gas fired reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND WITHIN HUNSHELF COMPOUND, TOFT'S LANE, OXSPRING, BARNSLEY, S36 8WR (1 component)

A gas engine CHP site providing hot water to a local district heating network

Inactive • 2022-23 (T-4)
Land to the south of the A883 near Bonnybridge FK4 1SN (5 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the south of the A883, Falkirk Road, near Bonnybridge FK4 1SN. This site pre-qualified last year as CFBS13 (4 components)
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• Load reduction on site supported by non-exporting standby generation.
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV.
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Land to the south east of Leyland National Substation, Braithwaite Road, Lillyhall Industrial Estate, Workington, CA14 4ED (4 components)
• 2.5 MW power plant comprising a series of gas reciprocating engines
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2017-18 (T-1)
Land parcel to the North of The Byre, Badsey Lane, Willersey, Gloucestershire, WR11 7HF (3 components)
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
• Electro-Chemical Battery Energy Storage System (BESS)
Inactive • 2023-24 (T-4), 2020-21 (T-4)
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (2 components)
• A gas turbine CHP, providing steam and electricity to Hammersmith Hospital
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land, North of A683 & Heysham substation, Lancaster, Morecambe Bypass, Morecambe, Lancashire. (1 component)

Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility

Inactive • 2022-23 (T-4)
Land at Polhampton Farm, Overton, Basingstoke, RG25 3ED (2 components)
• 9.5 MWs of reciprocating engine generation connecting into existing 33kV substation
• A gas engine CHP site providing hot water to a local district heating network
Inactive • 2022-23 (T-3), 2021-22 (T-4)
LAND AT NEWOPAUL WAY WARMINSTER BUSINESS PARK BATH ROAD WARMINSTER WILTSHIRE BA12 8RY CH65 4EF (4 components)
• CMU consisting of a gas reciprocating engine and alternator
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
• Unit 3 at Saltend Power Station
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
• 5 MW of demand reduction
• CHP Unit
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.44 MW
Land at Growforth Ltd, Clockluine Road, Dunfermline, KY11 7HS (7 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS
• Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Futura Park, West of Ransomes Way, Ipswich IP3 9SQ (1 component)

A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP

Inactive • 2023-24 (T-4)
Land at Fawley , Northern Access Road, Southampton, SO45 1BD  (7 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Gas Turbine CHP GT001B
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Crown Farm, King John Bank, Walpole St. Andrew, Wisbech, Norfolk, PE13 5PR (16 components)
• Gas fuelled generation plant
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
LAND AND BUILDINGS AT, RIVERFORD FARM WELL BARN AND CADDAFORD, STAVERTON, TOTNES, TQ9 6AF. (Nearest postcode to grid reference: TQ11 0LA). (9 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Aggregate CMU from multiple sources
• Battery Storage Plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land adjacent to the SW of Glassenbury BESS, Glassenbury Road, Cranbrook, Kent, TN17 2QL (2 components)
• A new build storage station using batteries
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
Inactive • 2023-24 (T-4), 2020-21 (T-4)
Land adjacent to 607 and 609 London Road, and railway line, Stoneness Road, Thurrock, Essex, RM20 4BA - accessed via Manor Road (1 component)

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network.

Inactive • 2022-23 (T-4)
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (16 components)
• 10 x 1mw gas generator units to be installed on designated land at Burghfield Road Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• Existing CCGT
• One CHP, generating for site load which exceeds generating capacity. No aux load.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kent Road, Southampton, S017 3EA (4 components)

CHP plant

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Loading map...