Combined Heat and Power (CHP)

211 unique locations (1803 components) - Page 5 of 9

Land at Polhampton Farm, Overton, Basingstoke, RG25 3ED (2 components)
• 9.5 MWs of reciprocating engine generation connecting into existing 33kV substation
• A gas engine CHP site providing hot water to a local district heating network
Inactive • 2022-23 (T-3), 2021-22 (T-4)
Land, North of A683 & Heysham substation, Lancaster, Morecambe Bypass, Morecambe, Lancashire. (1 component)

Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility

Inactive • 2022-23 (T-4)
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (2 components)
• A gas turbine CHP, providing steam and electricity to Hammersmith Hospital
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land parcel to the North of The Byre, Badsey Lane, Willersey, Gloucestershire, WR11 7HF (3 components)
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
• Electro-Chemical Battery Energy Storage System (BESS)
Inactive • 2023-24 (T-4), 2020-21 (T-4)
Land to the south east of Leyland National Substation, Braithwaite Road, Lillyhall Industrial Estate, Workington, CA14 4ED (4 components)
• 2.5 MW power plant comprising a series of gas reciprocating engines
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2017-18 (T-1)
Land to the south of the A883, Falkirk Road, near Bonnybridge FK4 1SN. This site pre-qualified last year as CFBS13 (4 components)
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• Load reduction on site supported by non-exporting standby generation.
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV.
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Land to the south of the A883 near Bonnybridge FK4 1SN (5 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
LAND WITHIN HUNSHELF COMPOUND, TOFT'S LANE, OXSPRING, BARNSLEY, S36 8WR (1 component)

A gas engine CHP site providing hot water to a local district heating network

Inactive • 2022-23 (T-4)
Leicester Royal Infirmary, Infirmary Square, Leicester, LE1 5WW (9 components)
• CHP Unit
• Gas fired reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (5 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2022-23 (T-4), 2020-21 (T-1) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (12 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2022-23 (T-3), 2020-21 (T-1) ...
London Rd, Purfleet RM19 1SD (24 components)

Gas-fired CHP unit

Inactive • 2023-24 (T-1), 2022-23 (T-3) ...
29.12 MW
Longcliffe Quarry, B5056, Matlock, Derbyshire DE4 4HN, UK (15 components)
• Battery Storage facility
• gas reciprocating engines.
• gas-fired CHP unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Lower Dunton Road, Laindon, Basildon, Thurrock, East of England, England, SS16 6EB, (2 components)
• A new build gas fuelled generating station.
• A site with two gas engine CHPs, providing hot water to a local district heating network
Inactive • 2023-24 (T-4), 2020-21 (T-4)
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (1 component)

(Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.

Inactive • 2022-23 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Main Street, Burstwick, Hull, HU12 9EA (7 components)
• Poole Existing Site CHP
• Two engines of 2.7MW each and one of 1.9MW, all CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Marks & Spencer, Wolstanton Retail Park, Wolstanton, Newcastle, ST5 0AP (6 components)
• Centrax gas turbine CHP
• Import/Export metering with diesel generation at a retail store
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
0.87 MW
Marsh Green Idustrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY (9 components)
• Existing OCGT.
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Maxi Readymix Concrete, Enderby Road,Industrial Estate, Whetstone, Leicester LE8 6HZ (5 components)
• New build power station comprised of multiple reciprocating engines.
• On-site existing CHP generating unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Media City Prestwood Road Salford M50 2EQ (4 components)
• 1.8 MW CHP generation
• 1.800 MW CHP generation
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Media City Prestwood Road Salford M50 2EQ (6 components)
• 1.8 MW CHP generation
• 1.800 MW CHP generation
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.52 MW
Loading map...
Showing 25 locations