Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

211 unique locations (1803 components) - Page 4 of 9

Ninewells Hospital, Dundee, DD2 1UB (10 components)
• A Packaged 3.976MW, 11kV CHP
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
NEWLINCS Integrated Waste Management Facility. South Marsh Road, Stallingborough, NE Lincs, DN41 8BZ (4 components)

The component corresponds to one gas turbines embedded into a CHP located on an industrial plant. The turbine exports electricity onto the site's private network.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
NEWLINCS Integrated Waste Management Facility. South Marsh Road, Stallingborough, NE Lincs, DN41 8BZ (2 components)

The component corresponds to one gas turbines embedded into a CHP located on an industrial plant. The turbine exports electricity onto the site's private network.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, Leicestershire, LE19 1SU. (1 component)

One of six CHP units at University of Warwick, Coventry, CV4 7AL

Inactive • 2023-24 (T-4)
Minerva Road, Farnworth, Bolton, BL4 0JR (8 components)
• CHP generating for site load, which exceeds generating capacity. No aux load.
• CHP generating in NHS hospital. No aux load.
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (4 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (2 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Media City Prestwood Road Salford M50 2EQ (6 components)
• 1.8 MW CHP generation
• 1.800 MW CHP generation
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.52 MW
Media City Prestwood Road Salford M50 2EQ (4 components)
• 1.8 MW CHP generation
• 1.800 MW CHP generation
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Maxi Readymix Concrete, Enderby Road,Industrial Estate, Whetstone, Leicester LE8 6HZ (5 components)
• New build power station comprised of multiple reciprocating engines.
• On-site existing CHP generating unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Marsh Green Idustrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY (9 components)
• Existing OCGT.
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Marks & Spencer, Wolstanton Retail Park, Wolstanton, Newcastle, ST5 0AP (6 components)
• Centrax gas turbine CHP
• Import/Export metering with diesel generation at a retail store
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
0.87 MW
Main Street, Burstwick, Hull, HU12 9EA (7 components)
• Poole Existing Site CHP
• Two engines of 2.7MW each and one of 1.9MW, all CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (1 component)

(Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.

Inactive • 2022-23 (T-4)
Lower Dunton Road, Laindon, Basildon, Thurrock, East of England, England, SS16 6EB, (2 components)
• A new build gas fuelled generating station.
• A site with two gas engine CHPs, providing hot water to a local district heating network
Inactive • 2023-24 (T-4), 2020-21 (T-4)
Longcliffe Quarry, B5056, Matlock, Derbyshire DE4 4HN, UK (15 components)
• Battery Storage facility
• gas reciprocating engines.
• gas-fired CHP unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
London Rd, Purfleet RM19 1SD (24 components)

Gas-fired CHP unit

Inactive • 2023-24 (T-1), 2022-23 (T-3) ...
29.12 MW
Lhoist UK Ltd Hindlow Buxton SK17 0EL (12 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2022-23 (T-3), 2020-21 (T-1) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (5 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2022-23 (T-4), 2020-21 (T-1) ...
Loading map...
Showing 25 locations