Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

698 unique locations (9577 components) - Page 18 of 28

Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (18 components)
• Battery Storage Plant
• Hamms Hall - Existing Site CHP
• Poole Existing Site CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
18.43 MW
Hammersmith Hospital, Du Cane Road, Shepherds Bush, London, W12 0HS (11 components)
• 1x diesel generator with a total rated gross power capacity of 2.900 MW
• A gas turbine CHP, providing steam and electricity to Hammersmith Hospital
• Unit 3 at Saltend Power Station
Active • 2024-25 (T-1), 2022-23 (T-3) ...
2.33 MW
Hammersmith Hospital, 72 Du Cane Rd, London W12 0HS (2 components)
• CHP Unit
• CHP unit
Active • 2024-25 (T-4)
3.57 MW
Halton General Hospital, HospitalWay, Runcorn, Cheshire WA7 2DA (4 components)

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
Halton General Hospital, HospitalWay, Runcorn, Cheshire WA7 2DA (2 components)

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
Hallsville Quarter District Heat Network, Rathbone Street, London, E16 1GU (2 components)

1 x 1.2 MW Gas CHP engine, for the sole purpose of generating electricity for grid export.

Active • 2028-29 (T-4), 2025-26 (T-1)
2.18 MW
HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE (5 components)

CHP engines to be installed at: HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE

Active • 2025-26 (T-4), 2022-23 (T-1)
2.49 MW
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (25 components)
• CMU consisting of multiple reciprocating engines and alternators
• New build power station comprised of multiple reciprocating engines.
• On-site existing CHP generating unit
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Ground Floor Rear of 91-93 Sterte Avenue West Poole Dorset BH15 2AL (3 components)
• 6MW of DSR
• On-site existing CHP generating unit
Inactive • 2021-22 (T-4), 2020-21 (T-1)
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (15 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (16 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Genset 2.
• This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" status FCC Buckinghamshire Ltd. 300kT Energy from Waste Plant with c. 25MW net output. Auxiliary load is not included in the connection capacity i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
94.17 MW
Great Field Lane, Somerden Road, Hull, HU9 5QJ (2 components)
• New build one-hour duration storage to replace diesel plant
• gas-fired CHP unit
Active • 2025-26 (T-4), 2022-23 (T-3)
2.99 MW
Great Coates, Grimsby, DN31 2TT (5 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Active • 2025-26 (T-1)
5.08 MW
Great Coates, Grimsby, DN31 2TT (5 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Active • 2025-26 (T-1)
5.08 MW
Good Hope Hospital, Rectory Road, Sutton Coldfield, West Midlands, B75 7RR (4 components)

1 x gas engine with a total rated gross power capacity of 1.166 MW.

Active • 2028-29 (T-4), 2025-26 (T-1)
4.23 MW
GMV Energy Centre, 3-5 PEARTREE WAY, LONDON, SE10 0GY (6 components)
• A gas engine CHP site providing hot water to a local district heating network
• This CMU is formed of a battery bank and PCS capable of providing 30MW of power. The system is connected via switch gear and a transformer to the distribution network in WPD's West Midland region.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
17.14 MW
George Square Charles St Lane EH8 9AG (4 components)
• CHP generating for site load, which exceeds generating capacity. No aux load.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2019-20 (T-1)
Galley Hill Road Waltham Abbey Essex EN9 2AG (25 components)
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Redditch 20MW Gas Peaker Project
Active • 2028-29 (T-4), 2026-27 (T-4) ...
27.74 MW
Furness Vale Industrial Estate, Station Road, Furness Vale, SK23 7SW (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Frozen Foods Factory Supply, Whapload Primary substation, Rear of 203 Whapload Road, Lowestoft, Suffolk NR32 1XQ (15 components)
• 20MW of DSR
• 3.350 MW gas engine CHP plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
3.02 MW
7.20 MW
Frimley Park Hospital, Portsmouth Road, GU16 7UJ (8 components)
• CHP generating in NHS hospital. No aux load.
• CHP generating to cover site load, which exceeds generating capacity. No aux load.
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
French's Road, Model Farm, Walpole, Walpole Marsh, King's Lynn and West, PE14 7JF. (4 components)
• 25MW Lithium-ion Energy Storage System
• A gas fuelled generating station.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2027-28 (T-4), 2024-25 (T-4) ...
2.88 MW
Loading map...
Showing 25 locations