Combined Heat and Power (CHP)

698 unique locations (9577 components) - Page 16 of 28

Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (6 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2024-25 (T-1), 2023-24 (T-4) ...
12.92 MW
Land at Brook Farm, 90 High Street, Loscoe, DE75 7LJ (8 components)
• Battery energy storage unit
• CHPs at Queen Elizabeth Hospital
Active • 2028-29 (T-4), 2024-25 (T-1)
10.53 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Heysham 2 Power Station CMU 8: [HY2823] T_HEYM28 + (50% x T_HEYM2-D)
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
LAND AND BUILDINGS AT, RIVERFORD FARM WELL BARN AND CADDAFORD, STAVERTON, TOTNES, TQ9 6AF. (Nearest postcode to grid reference: TQ11 0LA). (9 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Aggregate CMU from multiple sources
• Battery Storage Plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land adjacent to the SW of Glassenbury BESS, Glassenbury Road, Cranbrook, Kent, TN17 2QL (2 components)
• A new build storage station using batteries
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
Inactive • 2023-24 (T-4), 2020-21 (T-4)
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (31 components)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Lithium ion battery storage plant
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
134.94 MW
land adjacent to the AYRSHIRE GRID 400KV COLLECTOR SUBSTATION, Cambelton Farm, Beech Avenue, Hunterston, West Kilbride, KA23 9QF. (4 components)
• 1 x Gas reciprocating engines with a total rated gross power capacity of 1.992 MW
• Lithium ion battery storage plant
• Paper Mill carrying out DSR using load turn-down.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
36.69 MW
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (15 components)
• 49.900MW Battery Energy Storage System
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire
• Battery Storage and demand reduction located at Abellio Walworth bus depot
Active • 2027-28 (T-4), 2023-24 (T-4) ...
Land adjacent to Brynfyrd Botley Road Romsey SO52 9DP (2 components)
• 1.6MW Combined Heat and Power at International Conference Centre
• Gas fuelled generation plant
Active • 2024-25 (T-1), 2023-24 (T-4)
1.37 MW
Land adjacent to 607 and 609 London Road, and railway line, Stoneness Road, Thurrock, Essex, RM20 4BA - accessed via Manor Road (1 component)

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network.

Inactive • 2022-23 (T-4)
Land adjacent Electricity Substation, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (10 components)
• New Build CMU comprising of Solar PV and associated plant
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.19 MW
Lancaster University, Bailrigg, Lancaster, LA1 4YW (12 components)
• Gas fired CHP unit
• Ratcliffe Unit 2 coal-fired unit
Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.45 MW
Lake Rd, Trafford Park, Stretford, Manchester M17 1TU, United Kingdom (5 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-1) ...
22.58 MW
LADYSMITH ROAD, GRIMSBY, DN32 9EE (4 components)

CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE

Active • 2025-26 (T-4), 2022-23 (T-1)
Knypersley Generation Unit G, Brown Lees Industrial Estate, Knypersley, Staffordshire, ST8 7DN (7 components)
• Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
• The CMU Component is made up of reciprocating diesel engines.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
8.09 MW
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (35 components)
• A Battery Energy Storage System.
• Combined Heat and Power Plant Olympic Park London
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.68 MW
Kingston Hospital, Galsworthy Rd, Kingston upon Thames KT2 7QB (5 components)
• 2MW - 2.3 MWH Battery Energy Storage System
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
Active • 2025-26 (T-4), 2022-23 (T-3) ...
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (18 components)
• Dungeness B Power Station CMU 22: [DN2222] T_DNGB22 + (50% x T_DNGB-D)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
765.00 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (16 components)
• 10 x 1mw gas generator units to be installed on designated land at Burghfield Road Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• Existing CCGT
• One CHP, generating for site load which exceeds generating capacity. No aux load.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kent Road, Southampton, S017 3EA (4 components)

CHP plant

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (5 components)
• Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Single combined cycle gas turbine with supplementary firing
Active • 2024-25 (T-4), 2022-23 (T-3) ...
369.00 MW
Loading map...
Showing 25 locations