Combined Heat and Power (CHP)

698 unique locations (9577 components) - Page 15 of 28

Land off Nottingham Road, Loughborough Leicestershire LE11 1ET (2 components)
โ€ข Energy centre comprising of lean burn, acoustically treated, national gas reciprocating engines.
โ€ข Hamms Hall - Existing Site CHP
Active โ€ข 2025-26 (T-4), 2022-23 (T-4)
Land off High View Road, South Normanton, Alfreton DE55 2FL Sutton in Ashfield (2 components)
โ€ข CHP Unit
โ€ข New reciprocating gensets in acoustic enclosure
Active โ€ข 2024-25 (T-4), 2022-23 (T-3)
2.80 MW
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (9 components)
โ€ข Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection capacity of 9MW.
โ€ข Genset 3
โ€ข The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active โ€ข 2025-26 (T-4), 2024-25 (T-4) ...
24.30 MW
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (4 components)
โ€ข 40MW battery storage located near to the Coalburn North 400kV substation.
โ€ข New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
โ€ข Solar T70 Based CHP System
Active โ€ข 2028-29 (T-4), 2022-23 (T-4)
41.87 MW
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (2 components)
โ€ข A gas turbine CHP, providing steam and electricity to Hammersmith Hospital
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive โ€ข 2023-24 (T-4), 2022-23 (T-3)
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)
โ€ข Gas fired CHP unit
โ€ข Load reduction on site supported by non-exporting standby generation.
โ€ข The CMU component is an aggregation of turn-down and onsite generation
Active โ€ข 2026-27 (T-4), 2023-24 (T-4) ...
5.46 MW
Land North of Thame Lane, Culham, Abingdon, Oxfordshire, OX14 3GY (5 components)
โ€ข CMU Component is 500kVA reciprocating diesel engine.
โ€ข Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering at the grid connection point. The detailed co-ordinates 'TQ 62205 76671' or what3words 'twist.launch.novel' will take you to an image of the site (in Google Maps you can see the storage system itself in the photo).
โ€ข This is a long standing existing CHP unit located on land within a manufacturing site.
Active โ€ข 2027-28 (T-4), 2022-23 (T-3) ...
Land, North of A683 & Heysham substation, Lancaster, Morecambe Bypass, Morecambe, Lancashire. (1 component)

Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility

Inactive โ€ข 2022-23 (T-4)
Land lying to the north west of Staithes Road, Hull, HU12 8DX (12 components)
โ€ข 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
โ€ข 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
โ€ข Gas fired CHP unit
Active โ€ข 2028-29 (T-4), 2025-26 (T-4) ...
41.44 MW
land immediately adjacent to the existing Windyhill Electricity Grid Substation, North Of Baljaffray Road, Bearsden, East Dunbartonshire, G61 4PU. (12 components)
โ€ข 1 x hydro turbine & synchronous generator
โ€ข 3.600MW of demand reduction
โ€ข Lithium ion battery storage plant
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
41.27 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (4 components)
โ€ข Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
โ€ข Component has yet to be procured.
โ€ข The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active โ€ข 2025-26 (T-1), 2024-25 (T-1) ...
30.69 MW
Land at Union Street, Masbrough, Rotherham, S61 1AA (10 components)
โ€ข District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
โ€ข Reciprocating genset in acoustic enclosure
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
52.26 MW
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (8 components)
โ€ข A new power plant, with associated civil works, switchgear and electrical connection.
โ€ข Nantwich Existing Site CHP
โ€ข The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.
Active โ€ข 2025-26 (T-4), 2023-24 (T-4) ...
Land at Seal Sands Road, Seal Sands, Middlesbrough, TS2 1UB (11 components)
โ€ข Gas fired CHP unit
โ€ข New build power station comprised of multiple reciprocating engines.
Active โ€ข 2024-25 (T-1), 2022-23 (T-4) ...
1.83 MW
Land at Polhampton Farm, Overton, Basingstoke, RG25 3ED (2 components)
โ€ข 9.5 MWs of reciprocating engine generation connecting into existing 33kV substation
โ€ข A gas engine CHP site providing hot water to a local district heating network
Inactive โ€ข 2022-23 (T-3), 2021-22 (T-4)
Land at Orwell Street, East Marsh, Grimsby DN31 3HF Grimsby (4 components)
โ€ข N/A
โ€ข New reciprocating gensets in acoustic enclosure
โ€ข one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active โ€ข 2024-25 (T-4), 2024-25 (T-1) ...
5.47 MW
LAND AT NEWOPAUL WAY WARMINSTER BUSINESS PARK BATH ROAD WARMINSTER WILTSHIRE BA12 8RY CH65 4EF (4 components)
โ€ข CMU consisting of a gas reciprocating engine and alternator
โ€ข Lithium Ion battery storage system capable of importing, storing and exporting electricity.
โ€ข Unit 3 at Saltend Power Station
Inactive โ€ข 2022-23 (T-4), 2021-22 (T-4) ...
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (17 components)
โ€ข 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
โ€ข 2026 kW CHP unit
โ€ข N/A
Active โ€ข 2025-26 (T-4), 2022-23 (T-4) ...
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
โ€ข 5 MW of demand reduction
โ€ข CHP Unit
โ€ข New reciprocating gensets in acoustic enclosure
Inactive โ€ข 2023-24 (T-4), 2022-23 (T-4) ...
7.44 MW
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (3 components)
โ€ข A Battery Energy Storage System.
โ€ข Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Active โ€ข 2028-29 (T-4), 2021-22 (T-4)
79.30 MW
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (25 components)
โ€ข 1,000MW electricity interconnector between GB and Belgian transmission systems. The Nemo Link interconnector will consist of subsea and underground cables connected to a converter station in each country, which will allow electricity to flow in either direction between the two countries. Nemo Linkยฎ will build the converter station on an 8 hectare site, formerly occupied by the Richborough Power Station, which now forms part of the Richborough Energy Park proposals. A similar converter station will be built in the industry zone Herdersbrug in Bruges.
โ€ข Battery energy storage unit
โ€ข Two gas CHP in a horticultural environment with no aux load
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
21.52 MW
Land at Growforth Ltd, Clockluine Road, Dunfermline, KY11 7HS (7 components)
โ€ข 10 gas reciprocating engines used for power generation, with associated infrastructure.
โ€ข CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS
โ€ข Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
Inactive โ€ข 2023-24 (T-4), 2022-23 (T-4) ...
Land at Futura Park, West of Ransomes Way, Ipswich IP3 9SQ (1 component)

A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP

Inactive โ€ข 2023-24 (T-4)
Land at Fawley , Northern Access Road, Southampton, SO45 1BDย  (7 components)
โ€ข CMU Component is 500kVA reciprocating diesel engine.
โ€ข Gas Turbine CHP GT001B
โ€ข Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
Inactive โ€ข 2023-24 (T-4), 2022-23 (T-4) ...
Land at Crown Farm, King John Bank, Walpole St. Andrew, Wisbech, Norfolk, PE13 5PR (16 components)
โ€ข Gas fuelled generation plant
โ€ข Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
โ€ข One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Inactive โ€ข 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations