Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

306 unique locations (5263 components) - Page 12 of 13

The fields close to Chear Farm Bungalow, Ely Road, Chittering, Cambridge, CB25 9PN (6 components)
• FENGEN (CMU) is a load reduction asset using lighting and battery energy storage (BESS) for growing of vegetables on an industrial scale.
• FENGH2 (CMU) is a new build generating 06.000MW gas fired CHP plant.
Inactive •
12.92 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (24 components)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
Inactive •
6.37 MW
The Ridgeway Enfield, Middlesex EN2 8JL (16 components)
Rejected
Inactive •
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (12 components)
• On-Site Generating CMU.
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Inactive •
153.69 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (18 components)
Rejected
Inactive •
Unit 2898 Tuscany Park Wakefield WF6 2TZ (10 components)
Inactive •
Unit 3016 Hereford Street Bolton BL1 8HU (16 components)
Inactive •
University of Warwick, Coventry, CV4 7AL (81 components)
Inactive •
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (24 components)

Warrington Existing Site CHP

WA5
Inactive •
14.73 MW
Westexe, Tiverton, Devon, EX16 5LL (11 components)
Inactive •
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (4 components)

New-Build CHP Generating Unit at Berry Wicks Farm.

Inactive •
2.51 MW
Loading map...
Showing 25 locations