Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

306 unique locations (5263 components) - Page 11 of 13

South Kensington Campus, London, SW7 2AZ (7 components)
Rejected
Inactive •
Southport & Formby District General Hospital, Town Lane Kew, Southport PR8 6PN (2 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.995 MW and a net power capacity of 0.961 MW

PR8
Inactive •
1.73 MW
Speke Blvd, Speke, Liverpool L24 9LE (9 components)
Inactive •
Springfields Salwick, Preston, PR4 0XJ (7 components)
Inactive •
Staithes Road, Preston, Hull, HU12 8TB (44 components)
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive •
28.83 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (13 components)

A gas engine CHP site providing hot water to a local district heating network

E3
Inactive •
0.69 MW
Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB (9 components)
Not Prequalified
Inactive •
Station Road, Chartham, Kent, CT4 7JA (1 component)
Inactive •
Station Road, Wigton, Cumbria CA7 9BG (71 components)
Inactive •
Staverton, Trowbridge, Wiltshire, BA14 6PH (43 components)
Inactive •
Stoneykirk Road, Stranraer, DG9 7BU (29 components)
Inactive •
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (10 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
EN9
Inactive •
4.35 MW
Syensqo Oldbury, Trinity St, Oldbury, B69 4LN (2 components)
Inactive •
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Inactive •
24.33 MW
19.34 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (11 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
CT7
Inactive •
11.64 MW
Thearne Lane Woodmansey Beverley HU17 0SA (6 components)
Inactive •
Loading map...
Showing 25 locations