Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

75 unique locations (1613 components) - Page 3 of 3

Plot 3, Barrow Man Road, Birchington CT7 0AX (22 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.

CT7
Inactive •
17.46 MW
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (11 components)

Two CHP gas engines in commercial horticultural environment with no auxilliary load

CT7
Inactive •
18.05 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (22 components)

CHP engine in a horticultural environment, natural gas, no aux load

CT7
Inactive •
14.72 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (10 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Inactive •
1165.32 MW
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (49 components)
• One of three CHP in a horticultural environment
• One of three CHP in a horticultural environment.
Inactive •
40.66 MW
Rydings lane, North Meols, West Lancashire, Lancashire, PR9 8EB (2 components)

A gas fuelled Combined heat and Power plant

PR9
Inactive •
6.12 MW
Saltend Power Station Saltend Hull HU12 8GA (34 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Inactive •
3486.78 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Rejected TS90
Inactive •
116.23 MW
Snodland Paper Mill, Mill Street, Snodland, Kent, ME6 5AX (9 components)

On-site Generating CMU.

ME6
Inactive •
66.35 MW
Southport & Formby District General Hospital, Town Lane Kew, Southport PR8 6PN (2 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.995 MW and a net power capacity of 0.961 MW

PR8
Inactive •
1.73 MW
Staithes Road, Preston, Hull, HU12 8TB (44 components)
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive •
28.83 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (13 components)

A gas engine CHP site providing hot water to a local district heating network

E3
Inactive •
0.69 MW
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (10 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
EN9
Inactive •
4.35 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Inactive •
24.33 MW
19.34 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (11 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
CT7
Inactive •
11.64 MW
The fields close to Chear Farm Bungalow, Ely Road, Chittering, Cambridge, CB25 9PN (6 components)
• FENGEN (CMU) is a load reduction asset using lighting and battery energy storage (BESS) for growing of vegetables on an industrial scale.
• FENGH2 (CMU) is a new build generating 06.000MW gas fired CHP plant.
Inactive •
12.92 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (24 components)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
Inactive •
6.37 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (12 components)
• On-Site Generating CMU.
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Inactive •
153.69 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (24 components)

Warrington Existing Site CHP

WA5
Inactive •
14.73 MW
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (4 components)

New-Build CHP Generating Unit at Berry Wicks Farm.

Inactive •
2.51 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (42 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
CW8
Inactive •
232.80 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (24 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
Inactive •
9.85 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (16 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
SK9
Inactive •
9.05 MW
Young's House, Wickham Road, Grimsby DN32 8HW (12 components)
• On-site Generating CMU
• on site generating CMU
Inactive •
30.13 MW
Loading map...
Showing 25 locations