Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

9 unique locations (155 components)

Par Docks, Par, Cornwall PL24 2SQ (12 components)
• One 3.7 MWe gas fired CHP (Centrax KB5)
• Two 3.7 MWe gas fired CHP
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Par CHP, Par Docks, Par, St. Austell, PL24 2BN (13 components)
• CHP unit
• Gas CHP located in St. Austell
Active • 2026-27 (T-4), 2025-26 (T-4) ...
14.58 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• Ratcliffe Unit 3 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
61.51 MW
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (18 components)
• Dungeness B Power Station CMU 22: [DN2222] T_DNGB22 + (50% x T_DNGB-D)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
765.00 MW
Hammersmith Hospital, Du Cane Road, Shepherds Bush, London, W12 0HS (11 components)
• 1x diesel generator with a total rated gross power capacity of 2.900 MW
• A gas turbine CHP, providing steam and electricity to Hammersmith Hospital
• Unit 3 at Saltend Power Station
Active • 2024-25 (T-1), 2022-23 (T-3) ...
2.33 MW
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (47 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.26 MW
EMR Liverpool Alexandra Docks, 1, Alexandra Bldg, Alexandra Dock, Liverpool, L20 1BX (12 components)
• Existing Generation on existing site - CHP
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
20.15 MW
Asda Pendlebury, 604/612 Bolton Rd Pendleburry, Swinton, M27 4ET (11 components)
• 1.2 MW Combined Heat and Power Engine.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
19.57 MW
Asda Beverley, 20 Norwood , Beverley, HU17 9EY (11 components)
• 1.6 MW Combined Heat and Power Engine
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
19.20 MW
Loading map...
Showing 9 locations