33 unique locations (340 components) - Page 1 of 2

132 Manchester Road, Carrington, Manchester, M31 4AY (13 components)
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
• Poole Existing Site CHP
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1763.05 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
2435.45 MW
Asda Straiton, Bush Estate, Penicuik EH26 0QA (8 components)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Load reduction on site supported by standby generation
• Standby generation reducing load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
3.89 MW
Avlon Works, Severn Road, Hallen Bristol, BS10 7ZE, United Kingdom (3 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 2.758 MW.
• CHP plant.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Avlon Works, Severn Road, Hallen Bristol, BS10 7ZE, United Kingdom (5 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 2.758 MW.
• CHP plant.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Broadgreen Hospital, Thomas Drive, Liverpool L14 3LB (14 components)
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity of 1.949 MW
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.200 MW and total net power capacity of 2.181 MW
• ElecLink will have a transmission capacity of 1000MW corresponding to its grid connection agreements and link the 400kV AC grids of France and Great Britain. ElecLink will employ high voltage direct current converter stations using voltage source converter technology at each side of the Channel Tunnel. 400kV AC underground cables will connect the converter stations to the TSO's high voltage substations: Sellindge (NGET, UK) and Les Mandarins (RTE, France). The converter station on the Eurotunnel site at Folkestone will be connected by one 400kV AC cable circuit to the National Grid substation at Sellindge. The route length is approximately 14km. The converter station on the Eurotunnel site at Coquelles will be connected by one 400kV AC cable circuit to the RTE substation at Les Madarins. The route length is approximately 3.5km. An approximately 52km long HVDC cable circuit will connect the two converter stations via the Channel Tunnel between Folkestone and Coquelles. This will involve two single-core HVDC cables operating at +-320kV DC. Please note that in the section below we provided an address for the CMU which relates to the UK converter station site. Of course, given the CMU is an interconnector there are a variety of sites which are owned/managed by ElecLink and relate to the CMU, as additional information we have provided details of those sites below. Please note also that we have provided the grid reference points which most closely correspond to the sites, however the postcode for the address will capture a wider area. Sellindge substation Church Lane Aldington Ashford TN25 6SS Grid reference: TR082383 Converter station at Coquelles, France Eurotunnel Entrance Centre De Secours, 3573 Chemin Rouge Cambre, 62231 Coquelles, France Grid reference: TR657202 We wish to clarify here that while ElecLink has acceded to the BSC we have not yet begun installing or testing metering systems. Therefore, MPANs and BMU IDs do not apply to the ElecLink CMU at this point in time. ElecLink will ensure that the Delivery Body is updated as required once the metering systems are completed.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.64 MW
Claire Court, Rotherham - former Prince of Wales Power Station, Rotherham, South Yorkshire, S60 1RU (1 component)

1 x Gas reciprocating engine with a total rated gross power capacity of 2.200 MW and total net power capacity of 2.181 MW

Inactive • 2022-23 (T-3)
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (37 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
498.22 MW
ENERGY CENTRE, 13 HOOKERS ROAD, WALTHAMSTOW, LONDON, E17 6DPTQ 358 896 , (2 components)
• A gas engine CHP site providing hot water to a local district heating network
• Materials recycling plant.
Active • 2026-27 (T-4), 2022-23 (T-4)
0.35 MW
Enterprise Drive, Coven, Wolverhampton, Staffordshire WV10 7DY (9 components)
• CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS
• Municipal waste incineration plant located in Staffordshire. It is based on boilers supplying steam to a turbine-generator.
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
94.02 MW
Estates & Facilities, North Devon District Hospital, Raleigh Park, Barnstaple, EX31 4JB (2 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.800 MW

Active • 2028-29 (T-4), 2025-26 (T-1)
1.45 MW
Good Hope Hospital, Rectory Road, Sutton Coldfield, West Midlands, B75 7RR (4 components)

1 x gas engine with a total rated gross power capacity of 1.166 MW.

Active • 2028-29 (T-4), 2025-26 (T-1)
4.23 MW
Harworth Colliery, Harworth Park Industrial Estate, Scrooby Road, Harworth, Doncaster, South Yorkshire, DN11 8AB. (9 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 MW.
• 3 x Jenbacher 420 (1.4MW)
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
0.89 MW
Heartland Hospital, Bordesley Green E, Birmingham, B9 5SS (4 components)

1 x gas engine with a total rated gross power capacity of 1.519MW

Active • 2028-29 (T-4), 2025-26 (T-1)
5.37 MW
land adjacent to the AYRSHIRE GRID 400KV COLLECTOR SUBSTATION, Cambelton Farm, Beech Avenue, Hunterston, West Kilbride, KA23 9QF. (4 components)
• 1 x Gas reciprocating engines with a total rated gross power capacity of 1.992 MW
• Lithium ion battery storage plant
• Paper Mill carrying out DSR using load turn-down.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
36.69 MW
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (21 components)
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
• Multiple gas engines capable of exporting electricity.
• The CMU is a Open Cycle Gas Turbine (OCGT)
Active • 2026-27 (T-4), 2024-25 (T-4) ...
323.62 MW
Langstone Power Generation Plant, Southmoor Lane, Havant, Hampshire, PO9 1JW (10 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
19.05 MW
Lever House, Wood Street, Port Sunlight Wirral, CH42 4XN (4 components)

2x reciprocating gas engines with an aggregate gross capacity of 3.996 MW and net capacity of 3.908 MW

Active • 2028-29 (T-4), 2025-26 (T-1)
14.21 MW
Lister Hospital, Coreys Mill Lane, Stevenage, Hertfordshire, SG1 4AB (4 components)

1 x Gas reciprocating engine with a total rated gross power capacity of 1.400 MW and a net power capacity of 1.374 MW after considering the generator auxiliary load.

Active • 2028-29 (T-4), 2025-26 (T-1)
4.92 MW
MILLBROOK PARK ENERGY CENTRE, ROYAL ENGINEERS WAY, LONDON, NW7 1TF (7 components)
• A gas engine CHP site providing hot water to a local district heating network
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
• Plastics recycling facility located next to material recycling facility comprising several DSR loads: belts, cranes.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
25.37 MW
North Devon District Hospital, North Rd, Barnstaple, EX31 4JB (5 components)

1 x Gas reciprocating engine with a total rated gross power capacity of 0.801 MW

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Ormskirk and District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (7 components)
• 1 x gas reciprocating engine with a total rated gross power capacity of 0.900 MW and a net power capacity of 0.869 MW
• 4MW battery co-located with a solar farm
• Gas reciprocating engine
Active • 2028-29 (T-4), 2026-27 (T-4) ...
1.83 MW
Ormskirk & District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (5 components)
• 1 x Gas reciprocating engines with a total rated gross power capacity of 1.077 MW
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Royal Berkshire NHS Foundation Trust, London Road, Reading, RG1 5AN (4 components)
• 1 x Gas reciprocating engines with a total rated gross power capacity of 1.992 MW
• Generating Unit 2
Active • 2025-26 (T-4), 2019-20 (T-1)
Royal Devon & Exeter Hospital (Wonford) (Unit 3112), Barrack Road, Exeter, Devon, EX2 5DW (1 component)

1 x Gas reciprocating engine with a total rated gross power capacity of 1.521 MW and net power output of 1.487MW

Active • 2028-29 (T-4)
1.34 MW