Denmead Farm Edneys Lane Denmead Waterlooville PO8 0SJ (1 component)

(Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22GT1 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.

Inactive • 2022-23 (T-3)
Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 4TE (5 components)
• 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Inactive • 2023-24 (T-4), 2020-21 (T-1) ...
Land to the south of the A883 near Bonnybridge FK4 1SN (5 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (1 component)

(Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.

Inactive • 2022-23 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
To be determined (102 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22ST1 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW