Combined Heat and Power (CHP)

3 unique locations (53 components)

West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
255.05 MW
Viking Link, Bicker Fen Converter Station, North Ing Drove, Donnington, Spalding, Lincolnshire, PE11 4XY (4 components)
• A gas engine CHP site providing hot water to a local district heating network
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• HVDC interconnector between GB and Danish transmission systems. Viking Link will involve the construction of two converter stations, sited in GB and Denmark. At the converter stations, alternating current electricity from the sending end is converted to direct current electricity and transmitted through the cables. The direct current electricity will be converted into alternating current at the receiving end, before it is transmitted to consumers via the onshore electricity networks in GB and Denmark. In GB, the grid connection point for Viking Link is at Bicker Fen substation. The converter station at North Ing Drove is 2km from the substation which is connected via AC underground cables. From the converter station, the British onshore section covers 68km of HVDC underground cable to the landfall point of Boygrift which marks the beginning of the offshore route. The marine section of the link has a total of 621km from Boygrift to the Danish landing point of Blaabjerg through British, Dutch, German and Danish waters. From the Danish landfall point in Blaabjerg the Danish onshore section of Viking Link covers 76km of HVDC underground cable to the converter station which is adjacent to the Revsing substation.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Saltend Lane, HULL, HU12 8PP (33 components)
• Load reduction
• Load reduction on site
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Loading map...