Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (9 components)
• 4MW of DSR
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
T Soanes Poultry Church Hill Road Middleton-on-the-wolds Driffield YO25 9UG (4 components)
• 2MW of DSR
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.00 MW
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
• 6 x reciprocating engines
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Distribution Centre with behind the meter back-up generation.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (15 components)
• 4MW battery co-located with a solar farm
• 8.3MW Gas Turbine installation
• Unit 3 Cruachan pump storage hydro plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
7.47 MW
Slepe Farm Solar, Seven Acres Field, Slepe Farm, Slepe, Nr Poole, Dorset, BH16 6HS (4 components)
• 1 x 250kW/250kWh Lithium Ion Battery
• A 4.5MW gas fired reciprocating engine CHP (Engine 2).
Active • 2025-26 (T-4), 2020-21 (T-4) ...
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (9 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• Gas fuelled CHP generation plant
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.54 MW
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (16 components)
• A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt
• Didcot 3 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Nantwich Existing Site CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
11.11 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• Ratcliffe Unit 3 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
61.51 MW
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (8 components)
• 14.710 MW CHP generation
• A Battery Energy Storage System.
• The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1.07 MW
3678.80 MW
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (15 components)
• Battery energy storage unit
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.39 MW
41.27 MW
Haywood Grange PV Farm Heywood Grange Tickhill Lane Dilhorne Stoke-on-Trent ST10 2PL (3 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• Demand reduction
Active • 2025-26 (T-4), 2018-19 (T-1)
Frozen Foods Factory Supply, Whapload Primary substation, Rear of 203 Whapload Road, Lowestoft, Suffolk NR32 1XQ (15 components)
• 20MW of DSR
• 3.350 MW gas engine CHP plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
3.02 MW
Fitzwise Yard Troughbrook Road Hollingwood CHESTERFIELD S43 2JP (3 components)
• 4MW of demand reduction
• CHPs at Queen Elizabeth Hospital
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2021-22 (T-4)
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (13 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG244 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power generation units on the site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02).
Active • 2028-29 (T-4), 2027-28 (T-4) ...
382.93 MW
Cowie Sterling FK7 7BQ (6 components)
• 14.71 MW CHP generation
• 14.710 MW CHP generation
Active • 2025-26 (T-4), 2022-23 (T-3) ...
13.24 MW
Cowie Sterling FK7 7BQ (3 components)
• 14.71 MW CHP generation
• 14.710 MW CHP generation
Active • 2025-26 (T-4), 2020-21 (T-1) ...
Church Manorway, Erith DA8 1DL (60 components)
• N/A
• gas-fired CHP unit
Active • 2025-26 (T-4), 2024-25 (T-1) ...
50.35 MW
Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU (5 components)
• 20 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU
• Existing Generation on existing site - CHP
Active • 2024-25 (T-1), 2020-21 (T-4) ...
0.92 MW
BATTERSEA POWER STATION LONDON SW11 8AH (7 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.45 MW
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH (8 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

Active • 2027-28 (T-4), 2025-26 (T-1) ...
13.45 MW
Barrow Man Road Birchington Kent CT7 0AX (13 components)
• Load curtailment
• Syngenta - CHP unit
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
10.22 MW
Barnsley Facilities Services Limited Estates & Facilities Department Gawber Road Barnsley S75 2EP (14 components)
• 1 MW CHP generation
• 30MW/30MWh one hour battery storage asset located near BURWB1 asset
• Siemens SGT200 based CHP
Active • 2026-27 (T-4), 2024-25 (T-4) ...
5.34 MW