Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

21 unique locations (73 components)

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
Smurfit Kappa Townsend Hook, Snodland, Kent, ME6 5AX (2 components)

10.754 MW CHP Plant with 2 new Gas Turbines

Inactive • 2021-22 (T-4), 2018-19 (T-1)
9.68 MW
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (1 component)

10.754 MW CHP Plant with 2 new Gas Turbines

CHP and autogeneration LIMEJUMP LTD New Build Generating CMU Townsend Hook Not Prequalified ME6
Inactive • 2021-22 (T-4)
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (11 components)
• 8.300MW Gas Turbine installation
• 8.3MW Gas Turbine installation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
46.90 MW
Salisbury District Hospital, Odstock Road, Salisbury, Wiltshire. SP2 8BJ. (1 component)

1 x 850kW natural gas genset feeding site

CHP and autogeneration LIMEJUMP LTD Existing Generating CMU Avocardos SP2
Inactive • 2018-19 (T-1)
1.68 MW
Poole Hospital, Longfleet R, Poole, BH15 2JB (2 components)

0.85 MW CHP Located at Poole Hospital

Inactive • 2021-22 (T-4), 2018-19 (T-1)
14.66 MW
Poole Hospital Longfleet R Poole BH15 2JB (1 component)

0.85 MW CHP Located at Poole Hospital

CHP and autogeneration LIMEJUMP LTD Existing Generating CMU Mixed CHP BH15
Inactive • 2021-22 (T-4)
Media City, Prestwood Road, Salford, M50 2EQ (6 components)
• 1.8 MW CHP generation
• 1.800 MW CHP generation
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
5.22 MW
Media City, Prestwood Rd, Salford, M50 2EQ (2 components)

2MW CHP located at Salford

Inactive • 2021-22 (T-4), 2018-19 (T-1)
14.66 MW
Media City Prestwood Rd Salford M50 2EQ (1 component)

2MW CHP located at Salford

CHP and autogeneration LIMEJUMP LTD Existing Generating CMU Mixed CHP M50
Inactive • 2021-22 (T-4)
2.70 MW
Hillsborough Leisure Centre Beula road Sheffield S6 2AN (1 component)

0.194 MW CHP generation

Inactive • 2022-23 (T-4)
Cowie, Stirling, FK7 7BQ (4 components)
• 14.700MW CHP located at Cowie, Stirling.
• 2*7.5MW Gas Turbines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
27.88 MW
Cowie Stirling FK7 7BQ (1 component)

14.700MW CHP located at Cowie, Stirling.

CHP and autogeneration LIMEJUMP LTD Existing Generating CMU Mixed CHP FK7
Inactive • 2021-22 (T-4)
Cowie, Sterling, FK7 7BQ (9 components)
• 14.71 MW CHP generation
• 14.710 MW CHP generation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
69.89 MW
Birds Eye Limited. Whapload Road, Lowestoft, Suffolk NR32 1XQ (3 components)
• 1 x 3.3 MW gas engine CHP plant
• 3.348 MW gas engine CHP plant
CHP and autogeneration LIMEJUMP LTD Existing Generating CMU EXC_02 NR32
Inactive • 2021-22 (T-4), 2018-19 (T-1) ...
6.03 MW
Barnsley Facilities Services Limited, Estates & Facilities Department, Gawber Road, Barnsley, S75 2EP (12 components)
• 1 MW CHP generation
• 1.000 MW CHP generation
• 1.1MW Diesel CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.84 MW
Loading map...
Showing 21 locations