Combined Heat and Power (CHP)

25 unique locations (286 components)

1345 Govan Rd., Glasgow, G51 4TF (7 components)

CHPs at Queen Elizabeth Hospital

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
6.44 MW
530 London Road, Croydon CR7 7YE (7 components)

CHP

Inactive • 2023-24 (T-4), 2020-21 (T-1) ...
2.45 MW
530 London Road, Croydon, CR7 7YE (8 components)

Gas fired CHP unit

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
4.22 MW
Brigg Road, Scunthorpe, DN16 1BP (6 components)

CHP units

Inactive • 2019-20 (T-1), 2018-19 (T-1)
19.21 MW
Haxby Rd, York, YO91 1XY (17 components)
• CHP Unit
• Gas fired CHP unit
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.64 MW
James Cropper Plc, Burneside Mills, Kendal, LA9 6PZ (19 components)
• Gas fired CHP Unit
• Steam Turbine driven by gas fired CHP (component ID KPEG13)
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Kent Road, Southampton, S017 3EA (4 components)

CHP plant

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
• 5 MW of demand reduction
• CHP Unit
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.44 MW
Leicester Royal Infirmary, Infirmary Square, Leicester, LE1 5WW (9 components)
• CHP Unit
• Gas fired reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Pyewipe, Grimsby DN31 2SR (6 components)

CHP

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Repton Road, Measham, Swadlincote, DE12 7DT (19 components)
• CHP unit
• Gas fired CHP unit
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
5.26 MW
Southend University Hospital, Trust Prittlewell Chase, Southend-on-Sea, Westcliff on-Sea, SS0 0RY (12 components)
• A new build 19MW battery energy storage system
• CHP
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.45 MW
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (6 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
• Gas CHP located in St. Austell
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
TAMDOWN WAY SPRINGWOOD INDUSTRIAL ESTATE BRAINTREE ESSEX CM7 2QL (3 components)
• CMU consisting of a gas reciprocating engine and alternator
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• Solar T70 Based CHP System
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (8 components)
• Behind-the-meter battery storage system located at Emirates Stadium in London
• Gas Fired - CHP
• Ratcliffe Unit 4 coal-fired unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
To be determined (102 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22ST1 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW
UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST, GLENFIELD CLINIC, GROBY ROAD, LEICESTER, LE3 9QP (10 components)
• A 20MW New Build gas fuelled generating station.
• CHP plant
• New build battery
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations