Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

39 unique locations (352 components) - Page 1 of 2

1 Waterfront Avenue, Edinburgh, EH5 1SG (25 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
0.81 MW
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (5 components)
• Offsite with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Ainsworth Lane, Knowsley, Prescot, Mereyside, L34 9EU (11 components)
• On-site existing CHP generating unit
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (7 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Blackshaw Rd, London SW17 0QT (9 components)

CHP on a hospital site

Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
British Gas, Housesteads, Off Stockport Road, Hattersley, SK14 3QU (5 components)
• Office site with behind the meter back-up generation.
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (2 components)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (5 components)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2019-20 (T-1), 2018-19 (T-1)
6.05 MW
CAULDON LOW QUARRY, CAULDON, STOKE ON TRENT, STAFFORDSHIRE, ST10 3EW (8 components)
• EnerG 1000 CHP
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
21.54 MW
Clatterbridge Road, Bebington, Birkenhead, Wirral CH63 4JY (7 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Cleckheatone Road, Lowmoore, Bradford, BD12 0JZ (3 components)

Gas Turbine CHP (typhoon) SGT-100 rated 4.9MWe BABR-1_2

Inactive • 2019-20 (T-1)
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (14 components)
• Diesel Reciprocating Generator, rated 1MWe nominal
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.28 MW
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (16 components)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
• Steam Turbine
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.28 MW
Cookley Pumping Station, 8 Caunsall Road, Caunsell, Kidderminster, DY11 5YB (18 components)
• 1.280MW CHP
• Back up generation
• Onsite generation
Inactive • 2023-24 (T-1), 2019-20 (T-1) ...
2.88 MW
Edgabaston, Birmingham, West Midlands, B15 2TT (40 components)
• Gas Engine
• Gas Turbine Generator
• Gas turbine generator
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
7.28 MW
Ground Floor Rear of 91-93 Sterte Avenue West Poole Dorset BH15 2AL (3 components)
• 6MW of DSR
• On-site existing CHP generating unit
Inactive • 2021-22 (T-4), 2020-21 (T-1)
Harmire Road, Barnard Castle, County Durham, DL12 8D (10 components)
• Distribution centre with behind the meter back up generation
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
6.35 MW
Harmire Road, Barnard Castle, County Durham, DL12 8DT (22 components)
• Component has yet to be procured.
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land adjacent to the SW of Glassenbury BESS, Glassenbury Road, Cranbrook, Kent, TN17 2QL (2 components)
• A new build storage station using batteries
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
Inactive • 2023-24 (T-4), 2020-21 (T-4)
Land at Fawley , Northern Access Road, Southampton, SO45 1BD  (7 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Gas Turbine CHP GT001B
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land to the south east of Leyland National Substation, Braithwaite Road, Lillyhall Industrial Estate, Workington, CA14 4ED (4 components)
• 2.5 MW power plant comprising a series of gas reciprocating engines
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2017-18 (T-1)
Maxi Readymix Concrete, Enderby Road,Industrial Estate, Whetstone, Leicester LE8 6HZ (5 components)
• New build power station comprised of multiple reciprocating engines.
• On-site existing CHP generating unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Loading map...
Showing 25 locations