Combined Heat and Power (CHP)

3 unique locations (67 components)

Runcorn Site HQ, South Parade, PO Box9, Runcorn, Cheshire, WA7 4LT (16 components)
• 1MW / 1.15 MWH Battery Energy Storage System
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2026-27 (T-4) ...
113.33 MW
Kingston Hospital, Galsworthy Rd, Kingston upon Thames KT2 7QB (5 components)
• 2MW - 2.3 MWH Battery Energy Storage System
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
Active • 2025-26 (T-4), 2022-23 (T-3) ...
EDF Energy (Thermal Generation) Limited, Cottam Power Station, Outgang Lane, Cottam, Retford, DN22 0NP (46 components)
• 2MW - 2.3MWh Battery Energy Storage System
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1528.52 MW
Loading map...
Showing 3 locations