11 unique locations (278 components)

EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (31 components)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Lithium ion battery storage plant
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
134.94 MW
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (9 components)
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection capacity of 9MW.
• Genset 3
• The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
24.30 MW
Marsh Road, Far Banks, North Meols, Banks, West Lancashire, Lancashire, PR9 8DX (8 components)
• A gas fuelled CHP plant
• A gas fuelled Combined Heat and Power plant
• Gas reciprocating engines
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.51 MW
Orchardbank 1 Limited Battery Storage Site, Orchard Loan, Oilfield Machinery Ltd, Orchard Bank Industrial Estate, Forfar, DD8 1TD (3 components)
• 9.999MW/9.999MWh BESS located to the rear of Dean Park Orchard Loan in Orchardbank Industrial Estate
• CHP unit
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
2.00 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (6 components)
• Gas turbine generator
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2024-25 (T-1), 2023-24 (T-1) ...
69.82 MW
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FT (6 components)
• Gas fire generating unit
• One CHP engine in a horticultural environment with no auxilliary load.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (7 components)
• Battery located behind the meter within football stadium, able tor educe imported electricity and/or export to the local network
• Commercial sites
• Gas reciprocating engines.
Active • 2024-25 (T-4), 2024-25 (T-1) ...
6.38 MW
Whitwell Energy Park, Southfield Lane, Whitwell, Derbyshire, S80 3LH (9 components)
• CHP
• Gas reciprocating engines as the generating unit.
• Standby diesel generator that reduces site load when generating.
Active • 2027-28 (T-4), 2023-24 (T-4) ...
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9TG (10 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• Solar PV generation site
• SolarPV generating station
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.50 MW
Loading map...
Showing 11 locations