Combined Heat and Power (CHP)

12 unique locations (360 components)

Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
Asda Edinburgh, 100 The Jewel, Brunstane, Edinburgh, EH15 3AR (13 components)
• Existing Generation on existing site - CHP
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
19.96 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
179.28 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (18 components)
• Battery Storage Plant
• Hamms Hall - Existing Site CHP
• Poole Existing Site CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
18.43 MW
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (35 components)
• A Battery Energy Storage System.
• Combined Heat and Power Plant Olympic Park London
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.68 MW
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (31 components)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Lithium ion battery storage plant
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
134.94 MW
Marsh Road, Far Banks, North Meols, Banks, West Lancashire, Lancashire, PR9 8DX (8 components)
• A gas fuelled CHP plant
• A gas fuelled Combined Heat and Power plant
• Gas reciprocating engines
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.51 MW
Saltend Power Station Saltend Hull HU12 8GA (30 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3486.78 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.70 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (34 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.22 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build windfarm.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
41.74 MW
Loading map...
Showing 12 locations